Ruijie RG-ES100 Series Switches Hardware Installation and Reference Guide
System Debugging
4 System Debugging
4.1 Startup Check
4.1.1 Checking before the Device is Powered on
The switch is fully grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the switch.
4.1.2 Checking after Program Startup (Recommended)
After power-on, you are recommended to perform the following checks to ensure the normal operation of follow-up
configurations.
Check whether the status of the switch indicator is normal.
Check whether the service interface forwards data normally.