Mounting and Powering the SCG
Step 5: Install the Inner Rails on the Server
SmartCell Gateway 200 Getting Started Guide for SmartZone 3.4, 800-71126-001 Rev A
26
Step 5: Install the Inner Rails on the Server
Install the inner rails onto the hex head shoulder screws, and then slide the inner
rails forward.
Figure 10. Installing the inner rails
Step 6: Fasten the Inner Rails to the Server
Secure the inner rails with one #6-32 x 1/4 screw for each rail.
Figure 11. Securing the inner rails