
INS EJ1A
INS EJ1A
BRASS NUT
METAL WASHER
RUBBER WASHER
JIG
BRASS NUT
SPACER
FLANGE
TRIM RING
HANDLE
From the Mounting Kit, assemble one Brass
Nut, one Metal Washer and one Rubber
Washer to each Sidebody as shown.
Mount each Sidebody
(HOT on the left COLD
on the right)
from under the sink/deck and
assemble another Rubber Washer Metal
Washer and Nut, to the top side of each
Sidebody.
Next using the Jig provided, adjust the
top side Brass Nut so that the correct
sidebody height is achieved.
Tighten the Brass Nut on the
underside of the sink/deck to secure
each sidebody.
Place the Trim Rings as shown and
screw both Flanges to the Sidebodies.
Install the small Teflon Spacer atop
each flange before attaching the
Handles.
Turn each valve off and position each
Handle as required before tightening
the Set Screw using the Allen Key
provided.
1
2
3
4
5
6
SUPPLY HOSES
THREADED ROD
POP-UP BASKET
RUBBER WASHER
LIFT-ROD HOLE
To the bottom of the Spout assemble
both Supply Hoses
(HAND TIGHTEN
ONLY)
and the Threaded Rod from
the Spout Mounting Kit.
Place the Spout Trim Ring over the
centre hole and assemble the Spout
as shown.
From the underside of the sink/deck
assemble the remaining parts of the
Spout Mounting Kit to the Threaded
Rod. Rubber Washer first then the
Metal Washer and finally the Tie
Down Screw to secure the spout.
Attach each Supply Hose to the
corresponding Sidebody.
Do not over
tighten.
Insert the Pop-Up Basket and Rubber
Washer as shown in the sink.
Plumbers putty can be used instead
of the Rubber Washer if prefered.
Assemble the remaining Pop-Up parts
under the sink in the order shown,
making sure that the Lift-Rod Hole is
facing the back of the sink.
7
8
9
10
11
12
2
3