
M0119-1 version 3.1
13
3.2.2 Visual inspection and cleaning of tool attachment
The following maintenance activities should be carried out on the TA every 2
nd
week.
Action
Note
Clean contact surface (electrical versions
only)
Wipe the contact surface with a lint
free cloth.
Check cables and hoses
Check cables and hoses for
damages and squeezing, replace if
damaged.
Check tool attachment in general
Check the tool attachment for
damages. For replacement see
section 4.2
.
3.2.3 Cleaning and lubrication of tool changer
The following maintenance activities should be carried out on the TC every 6
th
month or
after 250,000 tool changes, whichever comes first.
Action
Note
Clean locking balls
Check the locking balls and wipe them
clean with a lint free cloth.
WARNING!
Risk of getting squeezed
between piston and ball holder when
the piston is taking closed position
Lubricate locking balls
Apply a small amount of grease
(Molykote BR2Plus) on the locking
balls.
NOTE!
It is important that this is done
or else there is a risk that the tool
attachment jams.
Summary of Contents for TC20
Page 2: ...2 M0119 1 version 3 1 ...
Page 19: ...M0119 1 version 3 1 19 ...
Page 20: ...20 M0119 1 version 3 1 ...