Rowlinson Garden Products SS269E Assembly Instructions Download Page 1

 x 2

drill

Large Log Store

 

 Assembly Instructions

English SS269E

Information

 No.

Components

Qty.

1  Floor

2

2  Left side panel

1

3  Right side panel

1

4  Centre panel

1

5  Back slat notched

2

6  Back slat

18

7  Shelf

1

8         Roof panel

2

9  Roof top board

2

10  Roof fascia

2

No.

Fixing Kit

Qty.

11  80mm screws

4

12  63mm screws

4

13  50mm screws

10

14  45mm screws

4

15  40mm nails

96

16  30mm nails

12

Before assembly

We recommend that time is taken to  

 

  read the instructions before starting  

 

  assembly, then follow the easy step by    

  step guide. The instruction sheet is only    

  a guide to the assembly. Certain items may  

  not be shown to scale. 

• 

Check all components prior to assembly

• 

This product should be assembled

  by no less than two people

• 

Drill all components where indicated

Recommended tools for assembly

• 

Power drill/screwdriver

• 3mm drill bit

• Cross head screwdriver bit    

• 

Tape measure    

• 

Hammer

• 

Spirit level

• 

Sharp knife 

 2022 © Rowlinson Garden Products Ltd

We constantly improve the quality of our products, occasionally 

the components may differ from the components shown and are 

only correct at time of printing. We reserve the right to change the 

specification of our products without prior notice.

If in doubt of any aspect regarding the assembly, use or safety of your log store, please contact us:

Help Line (Normal Office Hours)  01829 261 121

Email: [email protected]

ROWLINSON GARDEN PRODUCTS LIMITED

Green Lane

Wardle Nr. Nantwich

Cheshire

CW5 6BN

www.rowgar.co.uk  

45mm

45mm

80mm

6 . Roof

With the roof panels upside down, secure them together using 2 x 50mm screws. Once secured turn up the right way. 

Place the roof onto the main assembly and attach to each side panel by screwing 2 x 45mm screws down through the 

roof into the top frames of the side panels. In the middle of the roof, screw 4 x 80mm screws through the roof into the 

centre panel.

5 . Roof panels

To each roof panel, position a roof top board so that it overhangs the front edge by 50mm. Secure in place using 6 x 

30mm nails. Position the front fascia board underneath the top board and secure to the roof framing. At each end use 2 

x 40mm nails. In the middle use only 1 x 40mm nail. 

50mm

30mm

40mm

50mm

It may be necessary to drill 

pilot holes for all screws in 

this section.

Drill

1

2

3

4

5

6

7

8

9

10

Reviews: