![Rowlinson Garden Products SS198G Assembly Instructions Download Page 1](http://html1.mh-extra.com/html/rowlinson-garden-products/ss198g/ss198g_assembly-instructions_1493814001.webp)
HD Wallstore
English SS198G
No. Components
Qty.
1 Floor
1
2 Left side panel
1
3 Right side panel
1
4 Back panel
2
5 Door frame Uprights
(29x45x1345mm)
2
6 Door header panel
1
7 Front panel coverstrip
(92x12x1365mm)
2
8 Roof panel
(this part may come in 1,2 or 3 pieces)
3
9 Felt batten
(29 x 35 x 1790mm)
1
10 Left-hand door
1
11 Right-hand door
1
12 Door weatherstrip
(40 x 12 x 660mm)
2
13 Roofing felt
(2m)
1
14 Side bargeboard
(40x12x820mm)
2
15 Front bargeboard
(40x12x1825mm)
1
1
2
3
12
6
9
Before assembly
• We recommend that time is taken to
read the instructions before starting
assembly, then follow the easy step by
step guide. The instruction sheet is only
a guide to the assembly.
Certain items may not be shown to scale.
• Check all components prior to assembly
• This product should be assembled
by no less than two people
• Drill all components where indicated
Recommended tools for assembly
• Powered cross head screw driver
• Hammer
• Spirit level
• Sharp knife
• Drill
• 3mm drill bit
• 12mm drill bit
5
4
7
11
10
13
14
15
16
No. Fixing kit
Qty.
16 T-hinges
4
17 Hasp and staple
1
18 Tower bolts
2
19 Turn button
1
22 50mm screws
1
1
23 32mm screws
14
24 25mm screws
44
25 20mm screws
7
26 19mm roundhead screws
17
27 30mm nails
32
28 13mm felt nails
30
17
2014 © Rowlinson Garden Products Ltd
If in doubt of any aspect regarding the assembly, use or safety of your building please contact us:
Help Line (Normal Office Hours) 01829 261 121
ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane
Wardle Nr. Nantwich
Cheshire
CW5 6BN
18
We constantly improve the quality of our products, occasionally the
components may differ from the components shown and are only
correct at time of printing. We reserve the right to change the
specification of our products without prior notice.
19
x 2
Drill
Important information
Shiplap buildings come ready stained but this is only a preparatory treatment. To
VALIDATE
the guarantee, the building must be properly
treated with a recognised external wood preserver
WITHIN 3 MONTHS
of assembly and
RE-TREATED ANNUALLY
thereafter.
Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building. Placing the
building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions.
If the building is to sit on soil or grass it
MUST
be erected on pressure treated wooden 50mm x 50mm or similar bearers
(These are
not supplied in the kit).
Rowlinson Garden Products recommend using pressure treated bearers with all buildings on any type of base.
Timber Information.
As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry
spells the material may lose some of its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain
there will be a certain amount of swelling throughout the wooden panels. This process can not be avoided. If you have problems with
certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the building or the amount of air passing over the
building. During hot spells spray water directly onto the panels with the aid of a garden hose.
30mm
Ensure felt batten
overhangs the front
of the wallstore
13mm
30mm
30mm
30mm
9. Bargeboards
Attach a short bargeboard to each side ensure the top and front edges are flush with the roof line and secure each board
in place using 3 x 30mm nails. Attach the long bargeboard to the front of the roof make sure it is flush to the roof line use
5 x 30mm nails as shown.
Assembly Instructions
13mm
13mm
8. Roofing felt
Lay the roofing felt on the roof with an overhang all round. Fold the felt down at the front and secure using 10 x 13mm
felt nails to the felt batten. Tension the felt over the roof and fold down at the back and secure to the back panel using
10 x 13mm felt nails. Dress down each end of the felt and secure to the side panels using 6 x 13mm felt nails per end.
Once the felt is secure trim of any excess.
7. Roof
Secure the three roof panels to the felt batten using 3 x 30mm nails per panel, ensure the roof panels are flush to the
edge of the batten. Position the roof on the assembly and secure down using 14 x 32mm screws. Screw through the roof
panel into the top frames of the side panels, back panel and front header panel.
Important Note:
Roof may come in 1,2
or 3 pieces.
*Important Note:
Roof panels may come
in 1,2 or 3 pieces.
8
*
32mm
21 60mm screws
2
20 70mm screws
6