
Roverpet
20 Kiji Dava Circle Prescott, Arizona 86301
1-800-658-5925
Roverpet #WB2444DSF
24” high 4’ x 4’ Whelping Box Assembly Instructions
Inventory list for The Roverpet #WB2444DSF Whelping Box:
(7)
#124
24” high Panels
(1) #D24
24” high Door
(2) #F24
2
’x4’ Floors
(1)
#44DPK
Designer Puppy Keeper (6” high)
(1)
#44PR3
Puppy Rail assembly (two leg bars, two cross-bars and four legs)
(4)
#180
Straight Stabilizers
(4)
#90
Corner Stabilizers
(12)
#250
Floor/Divider clips
(16)
#200
Panel Clips (pre-assembled onto frames by Roverpet)
Assembly Procedure
1.) Unpack contents of shipping carton and compare to parts list above.
2.) Layout the two #124 panels / #D24 door sub-assemblies as show below, with the assembly containing the
door positioned on the right side.
3.) Connect the ends of the sub-assemblies together with the #200 panel clips that are already attached to the
end panels; reposition panels into a square shape resembling the main photo at the top of this page.
4.) Install #180 straight stabilizers onto the top of in-line connected panels (left photo below) and install #90
corner stabilizers onto the top of corner connected panels (right photo below).
#200 panel clips- pre-attached
to end panels here by Rover
Co.