background image

                Roverpet

    20 Kiji Dava Circle   Prescott, Arizona  86301    

800-658-5925

    

[email protected]

 

 

Page 2 of 3 

 

3.)  Insert one end of the

 

#48

CB’s into the large holes located near the ends of 

(1)

 #PR48LB. Slide the #48CB into the hole 

until about 4” is protruding through. 

 

 

4.)  Install the second #PR48LB into the two remaining ends of the #48

CB’s, using the same method as before. Make 

certain that all 4 legs installed in Step 2 are situated in the same direction. 

 

5.)  Take the assembled Roverpet Puppy Rail System and lower one side of the rails into your Roverpet whelping box. Line 

up the #PR48LB connecting ends with the 2nd vertical bars of the whelping box panels. 

Note:

 Make sure the #PR48LB connecting end will not be installed on a door panel, rotate the Roverpet Puppy Rail Assembly 

90* to avoid attachment on door panel. Verify the legs will rest on the floor of your whelping box when installation is complete. 

 

 

6.)  Clip the #PR48LB connecting ends around the vertical bars. 

 

 

7.)  With the one side of the #PR48LB installed on the vertical bars, slide the high-side of the Roverpet Puppy Rail System 

down into the Roverpet whelping box. Make sure the #PR48LB connecting ends are installed in the same manner as in 
the prior step. 

2

nd

 Vertical Bars 

Reviews: