Roverpet
20 Kiji Dava Circle Prescott, Arizona 86301
800-658-5925
Page 2 of 3
3.) Insert one end of the
#48
CB’s into the large holes located near the ends of
(1)
#PR48LB. Slide the #48CB into the hole
until about 4” is protruding through.
4.) Install the second #PR48LB into the two remaining ends of the #48
CB’s, using the same method as before. Make
certain that all 4 legs installed in Step 2 are situated in the same direction.
5.) Take the assembled Roverpet Puppy Rail System and lower one side of the rails into your Roverpet whelping box. Line
up the #PR48LB connecting ends with the 2nd vertical bars of the whelping box panels.
Note:
Make sure the #PR48LB connecting end will not be installed on a door panel, rotate the Roverpet Puppy Rail Assembly
90* to avoid attachment on door panel. Verify the legs will rest on the floor of your whelping box when installation is complete.
6.) Clip the #PR48LB connecting ends around the vertical bars.
7.) With the one side of the #PR48LB installed on the vertical bars, slide the high-side of the Roverpet Puppy Rail System
down into the Roverpet whelping box. Make sure the #PR48LB connecting ends are installed in the same manner as in
the prior step.
2
nd
Vertical Bars