![Rottler SG7MTS Operation And Maintenance Manual Download Page 26](http://html1.mh-extra.com/html/rottler/sg7mts/sg7mts_operation-and-maintenance-manual_1491988026.webp)
Section 3 Safety
SG7MTS Manual
www.rottlermfg.com
3-3
Job Completion:
If the operation is complete, the machine should be emptied and the work area cleaned.
Replacement Parts:
Use only Rottler replacement parts and accessories; otherwise, warranty will be null and void.
Misuse:
Do not use the machine for other than its intended use. If used for other purposes, Rottler Manufacturing
disclaims any real or implied warranty and holds itself harmless for any injury or loss that may result from
such use.
No list of safety guidelines can be complete. Every shop environment is
different. Always consider safety first, as it applies to your individual working
conditions. Use this and other machinery with caution and respect. Failure to
follow guidelines could result in serious personal injury, damage to equipment or poor work results.
Electrical Power
Make sure all electrical equipment has the proper overload protection. The SG7MTS should have a
fully
isolated
power supply to prevent damage and uncontrolled movement of the machine.
If the SG7MTS is on the same power lines that are running to other electrical equipment (grinders,
welders, and other AC motors) electrical noise can be induced into the SG7MTS electrical system.
Electrical noise can cause the controller to see false signals to move. Not supplying a fully isolated
supply to the machine may void factory warranty. Refer to the Power supply section later in this chapter
for voltage and amperage requirements of the SG7MTS.
Electrocution or a fire can result if the machine is not grounded correctly. Make
sure the ground is connected in accordance with this manual. DO NOT operate
the machine if it is not grounded. In the event of an electrical short, grounding
reduces the risk of electric shock by providing a path of least resistance to disperse electric current.
All electrical power should be removed from the machine before opening the
rear electrical enclosure. .
When you doing any operation on the cylinder head; the machine is capable of
throwing metal chips. Eye protection must be worn at all times by the operator and
all other personnel in the area of the machine.
The operator and nearby personnel should be familiar with the location and
operation of the Emergency Stop Button.
No single list of electrical guidelines can be comprehensive for all shop
environments. Operating this machinery may require additional electrical upgrades
specific to your shop environment. It is your responsibility to make sure your electrical system comply
with all local codes and ordinances.
Summary of Contents for SG7MTS
Page 2: ......
Page 4: ......
Page 10: ...Section 1 Introduction SG7MTS Manual www rottlermfg com 1 5...
Page 16: ...Section 2 Installation SG7MTS Manual www rottlermfg com 2 5...
Page 28: ...Section 3 Safety SG7MTS Manual www rottlermfg com 3 5...
Page 30: ...Section 4 Control Definitions SG7MTS Manual www rottlermfg com 4 2 Right Side Controls...
Page 53: ...Section 5 Operating Instructions SG7MTS Manual www rottlermfg com 5 21...
Page 54: ...Section 5 Operating Instructions SG7MTS Manual www rottlermfg com 5 22...
Page 58: ...Section 5 Operating Instructions SG7MTS Manual www rottlermfg com 5 26...
Page 65: ...Section 6 Maintenance SG7MTS Manual www rottlermfg com 6 6 Level Pin Setting...
Page 66: ...Section 6 Maintenance SG7MTS Manual www rottlermfg com 6 7 Linear Scale Setting...
Page 74: ...Section 7 Troubleshooting SG7MTS Manual www rottlermfg com 7 7...
Page 78: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 3 CABINET TABLE RISER ASSEMBLY...
Page 80: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 5 BASE ASSEMBLY...
Page 81: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 6 BASE ASSEMBLY PARTS DESCRIPTION...
Page 82: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 7...
Page 83: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 8 SPINDLE ASSEMBLY...
Page 85: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 10...
Page 86: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 11 TRANSMISSION ASSEMBLY...
Page 88: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 13...
Page 89: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 14 HEAD SUPPORT ASSEMBLY...
Page 91: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 16...
Page 94: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 19 SG7MTS Pneumatic Drawing...
Page 96: ...Section 8 Machine Parts SG7MTS Manual www rottlermfg com 8 21...
Page 98: ...Section 9 Options SG7MTS Manual www rottlermfg com 9 2...