Section 2 Installation
F103/4/5A Manual
www.rottlermfg.com
2-25
IMPORTANT! Placement of Machine
It is critical that the machine be placed in an area of the facility that has a stable thermal environment. The
machine should be kept away from direct sunlight, large heating units, and doorways that would allow
outside air direct contact on the machine.
Exposure to the above and other extremes in temperature will cause thermal drift to occur in the
machines which could have a detrimental effect on machining accuracy. A number of unrepeatable errors
in machine performance have been linked to this condition.
Location
The productivity of this machine will depend a great deal on its proper initial installation. Pay particular
attention to the means by which work pieces are lifted into the machine as well as the material handling to
and from other operations in your shop.
The proper loading arrangement and area location for your F103/4/5A machine is extremely important.
A slow travel (6’ to 10’ per minute) power hoist, operated from either a bridge crane or a jib crane
arrangement works very well. Verify the hoist has a rating that exceeds the load being lifted.
For the shop where large production runs are anticipated, the work pieces should be directly loaded
and unloaded from a conveyor. If this is not the case we recommend considerable attention be given to
the crane so that it covers an adequate area, to allow the operator to back up and remove work pieces
without creating a dangerous, cluttered work area.
Unpacking
Use care in removing the crate materials from the machine. Be careful not to use force on any part of the
machine.
Remove the toolbox, parallels and optional equipment from the machine. Completely clean these articles
as well as the rest of the machine with solvent. Rust inhibitor was applied, at the time of shipment. Any of
this left on the machine, will allow cast iron dust to collect in that area, which could cause premature wear.
Column Hold Down
The machine was shipped with the column held in place with chains and turnbuckles to the Main bed. Do
not attempt to move the machine under power until these restraints have been removed.
Leveling
Located in the bottom of the main base are the leveling and tie down screws. If care is taken, the main
base can be leveled extremely accurately. Start by placing the jacking pads under the jacking screws.
Adjust the jacking screws so the lowest point of the main base is at least 1/4” off the jacking pad. Make
sure all the jacking screws are touching their jacking pads. Use a precision machinist’s level, and
check the base at several points to get an idea where the high and low spots are, adjust evenly where
necessary. Start with the back way surface. With your precision level, level the back way in the lengthwise
direction to .0005” per foot. Take the readings approximately mid way between the jacking points.
Use a precision metal support to span the distance between the front and rear parallels. (Support must be
parallel within .0005” in its length). Take readings over every jacking bolt and level within .0005” over the
length of the base. Be sure to use the jacking points down the middle of the main base.
Recheck the way surfaces for level. Now check the machine table. Using the front jacking screws level
the table within .0005” in both directions.
Be sure that all jacking bolts have approximately equal weight on them. As you go leveling the base snug
the tie down bolts to help hold the main base in place. Recheck all areas of the main base for level.
Summary of Contents for F103 Series
Page 2: ......
Page 4: ......
Page 10: ...Section 1 Introduction F103 4 5A Manual www rottlermfg com 1 5...
Page 21: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 10...
Page 26: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 15...
Page 43: ...Section 2 Installation F103 4 5A Manual www rottlermfg com 2 32...
Page 99: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 12...
Page 102: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 15...
Page 105: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 18...
Page 106: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 19...
Page 115: ...Section 5 Operating Instructions F103 4 5A Manual www rottlermfg com 5 28...
Page 189: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 2 Grease Cross Reference Chart...
Page 190: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 3...
Page 191: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 4...
Page 192: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 5...
Page 196: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 9 Lubrication Locations...
Page 197: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 10 Lubrication Locations cont...
Page 199: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 12 Air Line Diagram...
Page 216: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 29...
Page 217: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 30...
Page 246: ...Section 6 Maintenance F103 4 5A Manual www rottlermfg com 6 59...
Page 267: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 2 Rear Left Sheet Metal...
Page 268: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 3 Right Rear Sheet Metal...
Page 269: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 4 Air Control Door...
Page 270: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 5 Air Control Solenoid Pack...
Page 271: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 6 Oiler Door...
Page 274: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 9 Enclosure Inside Parts...
Page 275: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 10 Enclosure Panel...
Page 276: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 11 DIN Rail Components...
Page 278: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 13 Computer Components...
Page 279: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 14 Spindle Base Right Side...
Page 280: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 15 Spindle Base Left Side...
Page 282: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 17 Motor Housing Parts...
Page 283: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 18 Z Axis Motor Parts...
Page 284: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 19 Counter Balance Pulley Parts...
Page 288: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 23 Upper Spindle Ballscrew Parts...
Page 289: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 24...
Page 290: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 25 Lower Spindle Ballscrew Parts...
Page 291: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 26...
Page 297: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 32 Pendant Swing Arm...
Page 299: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 34 Pendant Components...
Page 300: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 35 Main Base Parts...
Page 303: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 38 Chip Shield Assembly...
Page 304: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 39 Front Cover and Lights...
Page 305: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 40 Oil Line Diagram...
Page 307: ...Section 8 Machine Parts F103 4 5A Manual www rottlermfg com 8 42...
Page 309: ...Section 9 Options F103 4 5A Manual www rottlermfg com 9 2...
Page 311: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 2...
Page 312: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 3...
Page 313: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 4...
Page 314: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 5...
Page 315: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 6...
Page 316: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 7...
Page 317: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 8...
Page 318: ...Section 10 Material Data Safety Sheets F103 4 5A Manual www rottlermfg com 10 9...