gk 02/2006
1
Fig 1:
Operating elements of pump
3 Pivoted
lever
Pos 1 Pivoted lever closed - operating state
Pos 2 Pivoted lever open - for tube change
4
Cartridge – remove for tube change
7
Feed tube
8
Tube clamp
10
Manual nuts for dismantling the pump head
15 Operation
LED
16 Speed
control
17 Direction
Switch
Pericyclic Pump – Roth Cyclo II
Y374., EP74.1, EP75.1 and EP76.1
Congratulations!
You’ve made an excellent choice. We at Carl Roth GmbH & Co. KG thank you for your confidence.
This instruction manual will familiarize you on how to operate and use our pericyclic pump, Roth
Cyclo ll. Please read it thoroughly before operating the unit.
Operating Instructions
Page
1. Delivery
includes
2
2. Safety
instructions
2
3. Areas of Application
2
4. Initial operation
3
5. Tube cartridges and Tubes
3
5.1 Selection of the correct tube cartridge
3
5.2 Inserting and replacing Tube
4
6. Setting the optimum Tube Pressure
4
7. Changing the Operating Conditions
4
8. Service and Cleaning
4
8.1 Outside Cleaning
4
8.2 Disinfection
5
9. Dismantling the pump head
5
9.1 Turning the pump head
5
10. Malfunctions
5
11. Technical Data
6
12. Accessories
6
15
16
17
3
4
8
7