
BRP-Rotax
INSTALLATION MANUAL
VALIDATION OF INSTALLATION
General
The validation procedures described in this chapter do not claim to be complete. The cor-
rect execution and compliance with all given system limitations and interface descriptions
as well as with standards and norms given by authorities must be proven by the aircraft
manufacturer.
Check starting
• Check of starting at cold weather condition. Starter interface must be executed.
Effectivity: 915 i A Series
Edition 0/Rev. 0
Page 7
December 01 2017
Summary of Contents for 915 iS 3 A
Page 165: ......