![Rotax 125 MAX DD2 evo Installation Instructions And Operators Manual Download Page 61](http://html1.mh-extra.com/html/rotax/125-max-dd2-evo/125-max-dd2-evo_installation-instructions-and-operators-manual_1489750061.webp)
BRP-Rotax
INSTALLATION MANUAL
VENTING OF THE GEAR
COMPARTMENT
Step
Procedure
1
Remove cap from the venting screw.
2
Establish a connection between the
venting screw and a collecting reser-
voir using a piece of the supplied fuel
hose of an appropriate length.
NOTE
The venting hose must not reach all the way to
the bottom of the collecting reservoir.
ATTENTION
Do not attach the venting hose on the bottom
of the collecting reservoir, if only one reservoir
is in use.
Page 4
Edition: September 01 2019
Effectivity: 125 MAX DD2 evo
Summary of Contents for 125 MAX DD2 evo
Page 2: ...General information BRP Rotax recommends products of the following companies...
Page 63: ...Operator s Manual...
Page 65: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 67: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 73: ...Page 6 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 81: ...Page 8 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 113: ...Page 12 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 119: ......