![Ross Synergy 2 SD Installation Manual Download Page 68](http://html1.mh-extra.com/html/ross/synergy-2-sd/synergy-2-sd_installation-manual_1489028068.webp)
2–24 • Installation
Synergy Series Installation Guide (v18)
3. Hang the door on the top of the frame using the lip on the top of the door.
4. Press both sides of the door to the frame.
5. Release the sliding latches ensuring the two latches pop into place and are secure.
This completes the procedure to install the frame door.
Installing the Frame Power Supply
The frame’s power supply tray plugs
vertically
into the right-hand section of the chassis. The supply is
universal, and no power adjustments are required. The secondary (redundant) supply, if ordered, is
already installed in the tray.
Use the following procedure to install the frame power supply:
1. Carefully unpack the power supply from its box, and retain all packing material for
future use, if required.
2. Align the guide rails on the top and bottom of the tray with the slots in the chassis.
3. Push the power supply in firmly to ensure a tight connection at the rear of the frame.
4. On the top left of the power supply module, loosen the two mounting screws that secure
the power supply’s safety bracket in place.
5. Place the bracket behind the fold-over to the left of the power supply’s frame cavity by
moving the bracket towards the left.
6. Once in place, tighten the two mounting screws to secure the supply module in the
Synergy chassis.
This completes the procedure to install the frame power supply.
Connecting Frame Power
Refer to the following diagram when installing frame power for your Synergy SD switcher.
Primary and Redundant Connectors
Warning
The power supply should only be installed by qualified service
personnel. In case of a power supply failure, contact your dealer or
Ross Video.
Protective
Earth
The safe operation of this product requires that a protective earth
connection be provided. This protective earth is provided by the
grounding conductor in the equipment’s supply cord. To reduce the
risk of electrical shock to operator and service personnel, this ground
conductor must be connected to an earthed ground.
RATING:
85 - 250 V
47 - 63 Hz
600 WATTS
RATING:
85 - 250 V
47 - 63 Hz
600 WATTS
AC POWER
PRIMARY
REDUNDANT
1
2
Summary of Contents for Synergy 2 SD
Page 1: ...Ross Video Limited Installation Guide Volume I Software Issue 18...
Page 10: ......
Page 18: ...viii Contents Synergy Series Installation Guide v18...
Page 88: ...2 44 Installation Synergy Series Installation Guide v18...
Page 122: ...4 18 Preliminary Video Installation Synergy Series Installation Guide v18...
Page 132: ...5 10 Using the Menu System Synergy Series Installation Guide v18...
Page 156: ...6 24 BNC Configuration and Check Synergy Series Installation Guide v18...
Page 292: ...9 62 Additional Installation Setups Synergy Series Installation Guide v18...
Page 326: ...11 10 Still Stores Synergy Series Installation Guide v18...
Page 346: ...12 20 Editors OverDrive Synergy Series Installation Guide v18...
Page 394: ...GL 4 Glossary of Terms Synergy Series Installation Guide v18...