Synergy Series Installation Guide (v18)
Installation • 2–23
Installing the Electronics Frame
The electronics frame is designed to be rack mounted. Note the following installation requirements:
•
Rack Units
: 11 RU
•
Height
: 19.5 inches (49.5 cm)
•
Depth
: 19.25 inches (48.9 cm)
•
Rack
: standard 19 inch wide equipment rack
Install the frame for maximum stability during operation, and in such a way as to allow adequate
ventilation. Ensure that
both sides
of the frame are clear, so that switcher airflow is not restricted in
any way. If possible, but not required, leave a 1RU space above the frame to facilitate installation and
removal of the frame door. The frame’s location should be accessible, reasonably dry, and dust free.
Please note:
•
The system is shipped with the door on.
•
The system is shipped with all circuit boards (and the requested quantity of input
crosspoint boards) already installed.
•
As a precaution after installation, ensure that all boards are tightly pushed into their rear
frame connectors. The circuit board extractors on the sides of the boards allow easy
installation and removal.
Installing the Frame Door
If you have the room in your rack, leave a 1RU space above the frame to prevent the equipment
directly above from mildly encumbering the installation and removal of the frame door. The door can
be installed and removed without the space.
Use the following procedure to install the frame door:
1. Grasp the door by the sliding latches on either side and retract the latches.
2. Place the door over the front of the frame so the sides of the door are lined up with the
frame sides. Ensure that the light covers are in the bottom right corner.
Warning
The
Frame Processor Module 4000A-003
(labeled on the card
front edge)
must be installed only in slot
4
of the frame, as illustrated
” on page 2–8. Damage
to Card and Frame will occur, otherwise.
Warning
The
MLE Carrier
4000A-002
(labeled on the card front edge)
must
be installed only in slot
5
of the frame, as illustrated in the section
” on page 2–8. Damage to Card and
Frame will occur, otherwise.
Caution
If the door is not aligned with the frame sides, the frame power switch
could be accidently toggled during step 4.
Summary of Contents for Synergy 2 SD
Page 1: ...Ross Video Limited Installation Guide Volume I Software Issue 18...
Page 10: ......
Page 18: ...viii Contents Synergy Series Installation Guide v18...
Page 88: ...2 44 Installation Synergy Series Installation Guide v18...
Page 122: ...4 18 Preliminary Video Installation Synergy Series Installation Guide v18...
Page 132: ...5 10 Using the Menu System Synergy Series Installation Guide v18...
Page 156: ...6 24 BNC Configuration and Check Synergy Series Installation Guide v18...
Page 292: ...9 62 Additional Installation Setups Synergy Series Installation Guide v18...
Page 326: ...11 10 Still Stores Synergy Series Installation Guide v18...
Page 346: ...12 20 Editors OverDrive Synergy Series Installation Guide v18...
Page 394: ...GL 4 Glossary of Terms Synergy Series Installation Guide v18...