![Ross Synergy 1 Maintenance Manual Download Page 77](http://html1.mh-extra.com/html/ross/synergy-1/synergy-1_maintenance-manual_1489025077.webp)
Synergy 1 and Synergy 100 Maintenance Guide (v16-S1)
Option Boards • 4–7
Squeeze & Tease 2D Board
The figure below illustrates the
Squeeze & Tease 2D Board
.
Squeeze & Tease 2D Board
The
Squeeze & Tease 2D Board
installs on the front center of the
Frame Processor Board
, as
indicated in the figure below. The board mates with three connectors as shown, plus two mounting
standoffs. The standoffs secure the
Squeeze & Tease 2D Board
to the
Frame Processor Board
.
Squeeze & Tease 2D Board Mounting Location
Squeeze and Tease
Mounting Location
Summary of Contents for Synergy 1
Page 1: ...Ross Video Limited Synergy 1 and Synergy 100 Maintenance Guide Software Version 16 S1...
Page 10: ......
Page 16: ...vi Contents Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 24: ...1 8 Introduction Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 70: ...3 24 Software Upgrades Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 108: ...5 12 Frame Processor CPU Board Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 122: ...6 14 Working with Installed Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 142: ...8 14 Power Supplies Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 172: ...9 30 Calibration and Diagnostics Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 186: ...10 14 Control Panel Boards Synergy 1 and Synergy 100 Maintenance Guide v16...
Page 230: ...13 20 Miscellaneous Options Synergy 1 and Synergy 100 Maintenance Guide v16 S1...
Page 240: ...IX 10 Index Synergy 1 and Synergy 100 Maintenance Guide v16 S1...