Reference Manual
00809-0100-4799, Rev BA
September 2002
Model 3244MV
2-6
Typical European
Installation
1. Mount the thermowell to the pipe or the process container wall. Install
and tighten thermowells and sensors. Perform a leak check before
starting the process.
2. Attach a connection head to the thermowell.
3. Insert the sensor into the thermowell and wire it to the connection head.
The wiring diagram is located on the inside of the connection head.
4. Mount the transmitter to a 2-inch (50 mm) pipe or a suitable panel using
one of the optional mounting brackets. The B4 bracket is shown in
Figure 2-5.
5. Attach cable glands to the shielded cable running from the connection
head to the transmitter conduit entry.
6. Run the shielded cable from the opposite conduit entry on the transmitter
back to the control room.
7. Insert the shielded cable leads through the cable entries into the
connection head and the transmitter. Connect and tighten the cable
glands.
8. Connect the shielded cable leads to the connection head terminals
(located inside of the connection head) and the sensor wiring terminals
(located inside of the transmitter housing). Avoid contact with the leads
and the terminals.
Figure 2-5. Typical European
Process Mounting
Configuration.
644-0
000B
05B
Cable
Gland
Shielded Cable from
Sensor to Transmitter
Shielded Cable
from Transmitter
to Control Room
2-inch
Pipe
B4
Mounting
Bracket
Summary of Contents for 3244MV
Page 2: ......
Page 4: ......
Page 46: ...Reference Manual 00809 0100 4799 Rev BA September 2002 Model 3244MV A 12 ...
Page 58: ...Reference Manual 00809 0100 4799 Rev BA September 2002 Model 3244MV B 12 ...
Page 60: ...Reference Manual 00809 0100 4799 Rev BA September 2002 Model 3244MV Index 2 ...
Page 61: ......