background image

Assembly Instructions For

Manufactured for Rooms to Go.

Page 1 of 4

F

F

E

STEP 1

STEP 2

K

Leveler

NAJA BDPOSIHBQ 32359350 5935-3 QUEEN HEADBOARD GRAY
NAJA BDPOSIHBQW 32359374 5937-3 QUEEN HEADBOARD BROWN
NAJA BDPOSIFBQU 32759358 5935-7 QUEEN PANEL FOOTBOARD GRAY
NAJA BDPOSIFBQPW 32759372 5937-7 QUEEN PANEL FOOTBOARD BROWN
NAJA BDPOSIRSQK 32959376 5935-9 QN/KG RAILS GRAY
NAJA BDPOSIRSQKW 32959352 5937-9 QN/KG RAILS BROWN

OPTION 1

Thank you for purchasing this quality product.  Be sure to check all packing materials carefully for small

parts,which may have come loose inside the carton during shipment.  Identify and count all parts and

compare with the HARDWARE LIST below.

Caution: Please read instructions thoroughly before unpacking assembly parts.

1.We recommend that you assemble this product with the assistance of another person; this will make assembly

easier, and will help to eliminate damage to the product or injury to persons during assembly.

2.Please do not over tighten screws or bolts until the assembly is completed.

3.Please put all parts on a non-abrasive floor before assembly, and follow the assembly steps to assemble your newly

purchased product correctly and efficiently.

Q' TY

Hardware List

NO

.

NO.

 Parts List

2

E

F

G

Panel Footboard

1

2

4

Side rails

Slats

8

#4 x 1-1/4"L   Wood screw

H

4

K

4

Support legs for
center rail and slat
203 x 28 x 28mm

Extend support legs
163 x 28 x 28mm

Headboard

A

1

Q' TY

The screwdriver is not included

Reviews: