background image

Step 6 - Sealing

1.  Seal both sides of the Wall Profile inside and outside only where it meets the tiles.

2.  Fully seal the base of the Fixed Panel to the Bath top from the wall to the end of the Pivot Assembly.

• 

IMportant: Do not seal the base on the inside.

3.  The Top Cap has grooves and can be shortened by snapping off at these points (adding a small amount of 

sealant will help keep the cap in place).

4.  Fit the Bottom Seal ensuring that it is fitted with the deflector facing inward towards the bath. Push the seal 

up to the aluminium then trim the seal to length as required.

5.  Please allow 24 hours for the sealant to fully cure.

6.  Ensure the Branding Badge is placed prominently on a none moving aluminium part (where applicable).

Snap off

here

Grooves

Top Cap

Deflector

Summary of Contents for H2D6CS

Page 1: ...nclosed with this product Failure to validate the Guarantee will mean only the 1 Year Statutory Guarantee will apply CONSUMER GUARANTEE PRE INSTALLATION CHECKS 1 Check you have the correct product Please look at the labels on the side of the product packaging 2 Check all the product components are in the box and the fixing kits 3 Unpack your product and handle it with care 4 Please check the produ...

Page 2: ...al the bath along the tiled wall with a bathroom sealant not supplied 6 With the water still in the bath leave the sealant to cure for at least 24 hours Spray the seal and joints with the shower head and check for leaks when the silicon has cured Check the plumbing for leaks Do not plasterboard over the bath Do not grout the tiles when the bath screen has been fitted the grout may discolour the al...

Page 3: ...need to fix the Wall Profile in Step 2 You must ensure the glass runs parallel to the outside edge of the bath before marking the Bath Top You will need help to hold the screen in position while you mark the tiled wall and bath top IMPORTANT INFORMATION Failure to fit the fixed panel to the inside edge of the bath top will result in the bath screen leaking and will not be covered under the terms o...

Page 4: ...sealant the width of the Wall Profile at the bottom where the Wall Profile meets the tiled wall 6 Screw fix the wall profile to the wall using the 40mm screws supplied ensuring it is vertical 7 Apply a bead of sealant to the inside of the Wall Profile at the bottom where it meets the Bath top IMPORTANT The Wall Profile must be completely vertical the bubble should be in the centre of the 2 lines o...

Page 5: ... is also parallel to the outside edge 3 Drill three holes through the Fixed Panel into the Wall Profile with the 2 5mm drill bit supplied Ensure the Fixed Panel is sitting fully down on top of the bath and is completely vertical 4 Place the bases onto the 9mm screws and screw fix the Panel to the Wall Profile Fit the Cover Caps You will need help to hold the Fixed Panel in position while you drill...

Page 6: ...ring area and the Round Face to the outside 3 Offer the Moveable Panel onto the bottom Pivot Assembly then reattached the top Pivot Assembly so the panel is then secured into position 4 With the deflector facing inward push the Bottom Seal up onto the bottom of the Moveable Panel and also along until it butts up against the aluminium profile trim to length if required Please take care when cutting...

Page 7: ...l mark the wall through the hole in the locating bush 5 Drill the wall using a 6mm masonry drill not supplied insert the wall plug and screw fix the locating bush using the 40mm screw Make sure the bush is put on the correct way 6 Position the Brace Bar back onto the Fixed Panel and push the barrel over the locating bush and then tighten the set screws with the Allen key supplied 7 Slide the space...

Page 8: ... can be shortened by snapping off at these points adding a small amount of sealant will help keep the cap in place 4 Fit the Bottom Seal ensuring that it is fitted with the deflector facing inward towards the bath Push the seal up to the aluminium then trim the seal to length as required 5 Please allow 24 hours for the sealant to fully cure 6 Ensure the Branding Badge is placed prominently on a no...

Page 9: ...l 1 22 3 Fixed Panel Assembly 1 13 23 4 Brace Bar Assembly 1 14 24 5 Pivot Assembly Left Hand 1 15 25 6 Linear Seal 1 16 7 Tube Cap Right Hand 1 17 8 Moving Panel Assembly 1 18 9 Top Cap Right Hand 1 19 10 Pivot Assembly Right Hand 1 20 If you need to replace any damaged parts please see illustration below for parts list then call Customer Relations on 01325 328033 ...

Page 10: ... to keep your product looking new Clean your product using a mild detergent diluted in water and then polished off using a soft cloth If you live in a hard water area periodically clean your product using a 50 50 solution of white vinegar and water The solution should be left on the enclosure for approximately 5 minutes then rinsed off using warm water This method of cleaning should remove lime sc...

Reviews: