Maintenance Instructions
7
Page 19 of 22
Doc. No.: 13S000411
Revision: A
Copyright © 2010 Rolls-Royce plc
6 Functions
This chapter describes how to adjust parameter settings for some of the functions of the
remote control system.
Please be aware of that the described adjustments are already carried out by qualified
Rolls-Royce personnel at the commissioning and the sea trial period, and normally not
need to be changed. However, if transmitters or other devices are replaced it may be
necessary to re-adjust the current device.
6.1
Levers
When a lever has been replaced the operator device has to be re-calibrated. When
calibrating a lever the current thruster should not be running. All calibration is done
using the CDP tool described in the previous chapter. Calibration must be done for both
the Normal controller and the corresponding Backup controller.
There are at the most three lever functions available for calibration, depending on the
functions available for the current thruster. This is Pitch control, Rpm control and
Azimuth control. If the thruster have both Pitch and Rpm control but is operated only
through a common Pitch/Rpm lever, calibration of the Rpm control lever will not be
necessary. The thruster is then operating through combinator curves and the only
calibration necessary is calibration of the Pitch control lever.
6.1.1
Pitch Control Lever
A Pitch control lever has three adjustments available; Astern, Neutral and Ahead
position, with respective range adjustments.
Summary of Contents for Helicon X3
Page 2: ......
Page 4: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 8: ...Introduction Page 6 of 6 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 10: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 16: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 30: ...System Description Page 16 of 16 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 32: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 34: ...Delivery Specification Page 4 of 4 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 50: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 54: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 76: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 98: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 112: ...Trouble Shooting Page 16 of 16 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 114: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 118: ...Contact Information Page 6 of 6 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 120: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 124: ...Spare Parts Page 6 of 6 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 126: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 128: ...Tools Page 4 of 4 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 130: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 132: ...Design Drawings Page 4 of 4 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 134: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 136: ...Revision Page 4 of 4 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...
Page 138: ...Copyright 2010 Rolls Royce plc Doc No 13S000411 Revision A...
Page 140: ...Subsuppliers Manuals Page 4 of 4 Doc No 13S000411 Revision A Copyright 2010 Rolls Royce plc...