Manual
Weld Seam Detection System R4000 SND40
for Tubes, Cans and Drums
B0059001 / Rev. 2.3
Operation
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
73
7.5
Setup X/Y diagnosis
Screen area
1: Indication of the X and Y
signals and the control
signal vs. time.
2: 2-dimensional indication of
the signals of the eddy
current sensor.
3: Indication of all parameters
of the eddy current channel
and parameters for
controlling the X/Y
visualization.
Fig. 40: Setup X/Y diagnosis
Starts the continuous measuring
operation.
(Signals see chapter 11.1
timing diagram x/y with test job PLC or
test job KM)
Prints out the signal visualization and
the eddy current parameters.
Stops the continuous measuring
operation.
No key function in this mode.
Changes over to the ”setup operation“
mode.
Selects the parameters from the list.
Changes the program parameters.
X-share of signal:
yellow line.
Y- share of signal:
green line.
Pos: 54 /Schweissnaht/ Geräte/ SND40/8 Betrieb/Rundkö rpe r/Sta tistikfunk tion @ 0\mod_1186473113437_501.do cx @ 4449 @ 2 @ 1
1
2
3