
Preparing for Use
R&S
®
ZVA-Z75, -Z90, -Z110, -Z140, -Z170, -Z220, -Z325, -Z500
14
Getting Started 1307.7039.62 ─ 11
Figure 2-6: Test setup: 2-port transmission measurement for an NWA with two sources
Connecting the output connectors (MEAS OUT, REF OUT)
Suitable cables for connecting the output connectors to the network analyzer are inclu-
ded in the converter shipment. The connectors of these cables are labeled accordingly.
R&S
ZVA50 and R&S
ZVA67 require additional 1.85 mm to 2.92 mm adapters to con-
nect the cables. These adapters are offered as complementary adaption kits (see
1. Connect MEAS OUT of the converter to the NWA. Use the MEAS IN connector of
the NWA port that provides the RF source signal.
2. Connect REF OUT of the converter to the REF IN connector of the same NWA
port.
Figure 2-7: Test setup: 2-port transmission measurement for an NWA with four sources
Adaption kits R&S
ZCAK
As explained in the previous sections, depending on the NWA model, possibly addi-
tional adapters, power splitters and angled adapters are required to connect the
Putting the Converter into Operation