Getting Started
R&S
®
ZNB/ZNBT
18
User Manual 1173.9163.02 ─ 38
► Connect the network analyzer to the AC power source using the AC power cable
delivered with the instrument.
The maximum power consumption and the typical power consumption of the individual
analyzer models are listed in the data sheet.
The R&S
ZNBT is protected by a fuse located below the AC power switch; see
on page 1269. There are no such fuses on the
R&S
ZNB.
3.1.7 Starting the Analyzer and Shutting Down
The AC power switch is located in the upper part of the rear panel, together with the
mains connector and the fuse drawer (R&S
ZNBT only; see
on page 36 or
Chapter 3.2.4, "Rear Panel R&S
To start the analyzer, proceed as follows:
1. Switch the AC power switch to position
I
(On).
After power-on, the analyzer automatically goes to standby or ready state, depend-
ing on the state of the standby toggle key at the front panel when the instrument
was switched off last time.
2. If necessary, press the standby toggle key on the front panel to switch the instru-
ment to ready state (R&S
ZNB: green LED goes on; R&S
ZNBT PWR LED turns
from amber to green).
The analyzer automatically performs a system check, boots the Windows
®
operat-
ing system and then starts the network analyzer (VNA) application. If it was termi-
nated regularly, the VNA application restores all recall sets and instrument settings
of the previous analyzer session.
To shut down the analyzer, proceed as follows:
1. Press the standby key.
This will cause the instrument to save all loaded recall sets, close the VNA applica-
tion, shut down Windows
®
, and go to standby state. Of course you can also per-
form these steps manually, like in any Windows session.
2. If desired, set the AC power switch to position
O
(Off).
Putting the Analyzer into Operation