System configuration
R&S
®
SMBVB-K362, R&S
®
SMW-K362
9
User Manual 1178.9126.02 ─ 04
b) For only test plan-specific measurement report settings, double-click your test
plan in the "File Browsers" on the left, the tab "Test Plans". On the test plan
toolbar, select "Resources" menu > "Measurement Report...", use the button
"Create Specific Settings".
The settings of test plan specific resources are saved within the test plan.
4.3
Preparation of IVS connection
1. For the remote control of an IVS, configure the resource settings in "Resources"
menu > "Serial Port". Use settings compatible to your IVS.
Refer to the sequencer user manual, section Resources > Serial Port.
2. The following steps configure DUT attributes and properties.
Create your test plan
:
a) In the tab "Test Plans", specify a directory where you store your test plans.
b) Open configuration dialog via "File" > "New Testplan...".
Preparation of IVS connection