
3-3
VENICE 2U | Hardware Guide | Version 1.2
Rohde & Schwarz DVS GmbH
Installation
Note about the Network Installation
3.2 Note about the Network Installation
Because of the amount of possible workflows that customer’s may use
the VENICE 2U for as well as network connections (see section “Slot
Panel Connectors” on page 2-16), this document does not describe
how to connect the R&S DVS system to a network or central storage.
On the R&S DVS web page (www.dvs.de) you can find some diagrams
showing how the VENICE 2U may fit in a workflow/network.
To connect the R&S DVS system to a network/central storage, you
should have experience as a network administrator and know how to
set up the required network connections on the installation site in hard-
as well as software. In case you experience difficulties during the instal-
lation, R&S DVS offers you special assistance that will be tailored to
your personal needs and which can range from remote diagnosis to on-
site services. Please contact the R&S DVS service department for fur-
ther information about this.
Further information about possibilities to configure the network settings
can be found in the “R&S®VENICE Software“ user guide and the
“R&S®Spycer“ user guide.