
1xEV-DO Signaling
R&S
®
CMW-KM8xx/-KS8xx
15
User Manual 1173.9511.02 ─ 12
For a setup with only one downlink path you need only two of the four I/Q data connec-
tions.
The RF connections between R&S
CMW and DUT must be established in the same
way as without external fading.
2.2.1.4
Test Setup for Internal Fading Scenarios
If internal fading shall be used, the test setup is the same as for the corresponding sce-
nario without fading.
2.2.2 Initiating Signaling Tests
The 1xEV-DO forward signal is turned on as long as the "1xEV-DO Signaling" softkey
indicates the "ON" state, see
chapter 2.3.2, "Signaling Control"
switching on, wait until the hour glass symbol has disappeared.
When forward signal transmission has been turned on, the connection states can be
controlled via hotkeys at the R&S
CMW and via actions at the 1xEV-DO AT.
General Description
深圳德标仪器
135-1095-0799