Putting into Operation
R&S
®
NGA100
13
Getting Started 5601.8902.02 ─ 03
parts. If there is any damage, immediately contact the carrier who delivered the
instrument.
Packing material
Retain the original packing material. If the instrument needs to be transpor-
ted or shipped at a later date, you can use the material to protect the control
elements and connectors.
Risk of damage during transportation and shipment
Insufficient protection against mechanical and electrostatic effects during
transportation and shipment can damage the instrument.
●
Always ensure that sufficient mechanical and electrostatic protections
are provided
●
When shipping an instrument, the original packaging should be used. If
you do not have the original packaging, use sufficient padding to pre-
vent the instrument from moving around inside the box. Pack the instru-
ment in antistatic wrap to protect it from electrostatic charging
●
Secure the instrument to prevent any movement and other mechanical
effects during transportation
Delivery package
The package contents contain the following items:
●
R&S NGA100 power supply preloaded with two 230 V fuses
●
Four power cables
●
Two 115 V fuses (replace the preloaded fuses with these fuses depending on
the mains voltage, see
Chapter 4.2, "Switching On the Instrument"
on page 20 for more information)
●
One 5-pin plug for digital I/O port connection
●
One 8-pin terminal block plug for output connection
●
One Getting Started manual
●
One document folder containing Basic Safety instructions guide, KC and CE
certificate
Unpacking and Checking the Instrument