background image

- 1 -

User Manual

MC-7H with Touring frame

(BlackLED / No transparency)

Summary of Contents for MC-7H

Page 1: ...1 User Manual MC 7H with Touring frame BlackLED No transparency...

Page 2: ...2 Control System Contents Safety Information 03 Specification 06 Connection 07 Physical Connection 14 Accessories Base bar Assembly 08 09 16 18 Package 17 Service and Maintance...

Page 3: ...lling powering or servicing this product follow the safety precau tions listed below and observe all warnings in this manual and printed on the product If you have questions about how to operate the p...

Page 4: ...stallation by installing panels at the top and working downwards Disassemble an installation by removing panels at the bottom and working upwards Check that all external covers and rigging hardware ar...

Page 5: ...ey are not user serviceable If the data cables are damaged replace them only with new ones Never try to repair a data cable Per requirements of the National Electrical Code in the USA the length of a...

Page 6: ...of lightweight and firm structure With the amazing flexibility and high density both of them can be able to multi angle folded satisfy your solution for applications with long viewing distances IP Fr...

Page 7: ...Hanging system Stacking system MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H MC 7H...

Page 8: ...4 60kg 16A 8 tiles of MC 7H AC 220V 4 tiles of MC 7H AC 110V Name Part No Dimension Weight Max Length CAT 5 208004S0194 30m 1 40kg 100m Name Part No Dimension Weight Evision 201000S0009 L480 x W240 x...

Page 9: ...hanging installation B Level adjusting screw C Location Pin For stacking installation D Vertical connection lock Note Ring and Location pin can be removed and exchange with each other Before hanging i...

Page 10: ...irection of the horizontal connectors and make sure one red and one blue on the top side 0 degree 2 Install the base bar with panels Install the base bar on the panels with touring frame And lock the...

Page 11: ...installation please make sure the location pin is on the top of the bar Adjust the level adjusting screw and make the base bar keep horizontal on the ground Adjust the direction of the horizontal con...

Page 12: ...of di erent installation Adjust the knob and make sure the base truss horizontal Lock of base truss Case 1 Case 1 Adjust the knob and make sure the base truss horizontal Lock of base truss 3 Rear supp...

Page 13: ...13 Case 1 Case 2 Touring frame Rear support truss Rear bridge Base bar Base truss Stacking system 4 Panel installation...

Page 14: ...lign them pic5 4 Keep the connecting button on 0 degree pic5 5 Push handle back for locking pic7 Picture 1 Picture 2 Picture 3 Picture 4 Picture 5 Picture 6 Picture 7 Finish MC 7H panles Curve Install...

Page 15: ...15 0 degree 10 degree stacking installation hanging installation stacking installation hanging installation 10 degree stacking installation hanging installation...

Page 16: ...king voltage Power 100 240V AC 20W Working temperature 20 C to 45 C Input port DVI Output ports number 4 ports Communication port USB RJ45 2560 1024 Max resolution 2560 1024 1024 Data transmission por...

Page 17: ...between the receiving cards 2 The pins on the receiving card is curved or broken Disconnected the UTP cable between the receiving card and the panel Blue 2Hz second Red Always Red 2Hz second Green Alw...

Page 18: ...Package 09 18 8pcs LED panels per Flightcase 24pcs LED panels per T Dolly Pictures Flightcase T Dolly...

Page 19: ...ROE Visual Co Ltd No 1 3 Floor Bldg 7 Zhong Yuntai Technology Industrial Park Songbai Road Shiyan Street Baoan Shenzhen China Tel 86 0755 83924892 Fax 86 0755 83924891 E mail roe roevisual com www ro...

Reviews: