Installation
Electrical Connections
100
MagneMotion
Rockwell Automation Publication MMI-UM013B-EN-P - April 2020
NOTE:
When using multiple network switches to connect all node controllers, use
one switch as a master and connect all other switches to it as shown in
.
When using multiple MagneMotion Power over Ethernet network switches,
connect the Uplink from each switch to a master switch as shown in
, do not daisy chain these switches.
When using the optional SYNC IT controllers, use a network switch that is
dedicated to those controllers connected directly to the EtherNet/IP
™
port on
the PLC dedicated to synchronization as shown in
.
2.
Connect a cable for network communications from the network switch to each node
controller as shown in
•
For NC-S node controllers, connect the Ethernet cable to the NET 0 connector
as shown in
•
For NC-E node controllers, connect the Ethernet cable to the lower Network
connector as shown in
•
For NC-12 node controllers, connect the Ethernet cable to the ETHER-
NET/ETH connector as shown in
.
•
For NC LITE node controllers, connect the Ethernet cable to the LAN connec-
tor as shown in
NOTICE
The NC-S node controller does not support PoE. Connecting
the controller to a powered Ethernet network can damage it.
NOTICE
The NC-E node controller does not support PoE. Connecting
the controller to a powered Ethernet network can damage it.
NOTICE
The NC-12 node controller does not support PoE. Connecting
the controller to a powered Ethernet network can damage it.
NOTICE
The NC LITE only supports the custom MagneMotion Power
over Ethernet. Never connect the NC LITE to a standard PoE
network as damage to internal components can result.