Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
37
Track Installation
Chapter 2
4. Thread straps through lift slots as necessary for your installation and
secure them to hoist machinery.
5. Lift and transfer track section to its intended location.
Mount by using the M16 x 2 threaded holes and the slots in mounting
plate.
Strap Position for Horizontal Installation
Strap Position for Vertical Installation
Lift Slots
Lift Slots
Lift Slots
Lift Slots
Lift Slots
Lift Slots
Mounting plates are not shown for clarity.
500.0
(19.7)
450.0
(17.7)
45.0
(1.8)
90.0
(3.5)
25.0
(1.0)
12.7
(0.5)
4X 13.5
(0.53)
2X TAP M16 X 2.0
Summary of Contents for iTRAK
Page 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Page 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Page 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Page 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Page 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Page 123: ......