Rockwell Automation Publication 2071-UM001E-EN-P - November 2013
53
Chapter
4
Connect the Kinetix 3 Drive
Understanding Basic Wiring
Requirements
This section contains basic wiring information for the Kinetix 3 drive.
Topic
Page
Understanding Basic Wiring Requirements
Grounding Your Kinetix 3 Drive
Wiring the Kinetix 3 Drive Connectors
Apply the Motor Cable Shield Clamp
Feedback and I/O Cable Connections
ATTENTION:
Plan the installation of your system so that you can perform all
cutting, drilling, tapping, and welding with the system removed from the
enclosure. Because the system is of the open type construction, be careful to
keep any metal debris from falling into it. Metal debris or other foreign matter
can become lodged in the circuitry that can result in damage to components.
SHOCK HAZARD:
To avoid hazard of electrical shock, perform all mounting and
wiring of the Bulletin 2071 drive prior to applying power. Once power is
applied, connector terminals can have voltage present even when not in use.
IMPORTANT
This section contains common PWM servo system wiring configurations, size,
and practices that can be used in a majority of applications. National Electrical
Code, local electrical codes, special operating temperatures, duty cycles, or
system configurations take precedence over the values and methods provided.
Summary of Contents for Allen-Bradley Kinetix 3 2071-A10
Page 4: ...4 Rockwell Automation Publication 2071 UM001E EN P November 2013 Summary of Changes Notes ...
Page 8: ...8 Rockwell Automation Publication 2071 UM001E EN P November 2013 Table of Contents Notes ...
Page 16: ...16 Rockwell Automation Publication 2071 UM001E EN P November 2013 Chapter 1 Start Notes ...