Chapter 2 Installation – Standard Enclosure
Figure 5 - Standard Top Entry/Exit Locations
Figure 6 - Standard Bottom Entry/Exit Locations and Mounting Locations
Seismic Applications
•
For installation on concrete –
the minimum depth and radius of the
concrete which support the cabinet anchors is dependent on seismic
loads. See important information above.
•
For installation on a metal structure –
the metal plate depth and cabinet
anchoring method is dependent on seismic loads.
Joining Sections
• A - Line Cable Conduit Opening
5.68 x 9.00 [144 x 229]
• B - Load Cable Conduit Opening
9.00 x 10.00 [229 x 242]
• C - Control Wire Conduit Opening
3.00 x 3.00 [76 x 76]
0 [0]
4.65 [118]
16.04 [407]
30.00 [762]
36.00 [914]
0 [0]
3.
62
[9
2]
5.
41
[137
]
6.
62
[1
68]
36.
00 [9
14
]
A
B
C
A
B
C
D
E
• A - Line Cable Conduit Opening
5.68 x 9.00 [144 x 229]
• B - Load Cable Conduit Opening
9.00 x 10.00 [229 x 242]
• C - Control Wire Conduit Opening
3.00 x 5.00 [76 x 127]
• D - Non-removable Sill Channels
1.00 x 3.00 [25 x 76]
• E - Mounting Holes for 0.5 in. [12 mm]
Diameter Anchor Bolts
0 [0]
4.70 [119]
9.32 [237]
21.15 [537]
30.00 [762]
33.00 [838]
36.00 [914]
0 [
0]
2.3
1 [
59]
4.
62
[1
17
]
6.
38 [
162
]
7.6
8 [
17
0]
33
.6
9 [8
56
]
36.
00 [9
14
]
Joining hardware can be found in a package that is mounted to
the front of the shipping skid. See publication
for level
floor surface requirements.
IMPORTANT
For arc resistant cabinets, see
for special instructions.