Roche Diagnostics
Operator’s Manual · Version 3.1
E-9
Cedex Bio System
12 ISE description
Hardware
Hardware
Panels
The ISE cover has two joints. The front cover provides access to the parts you may
need to handle during daily operation. Opening the back cover as well provides
access to the peristaltic pump and its tubing.
Left side panel
Provides access to:
o
ISE power supply
o
ISE connectors
Do not remove; this panel should be removed by your service representative only.
ISE cover
Provides access to:
o
Electrodes
o
ISE unit tubing
o
ISE fluid bottles
Do not open this cover when the system is in
Operating
status.
Left service flap
Provides access to:
o
ISE tower
Remove this flap as instructed during maintenance actions, or shut down the system
and switch off the instrument before you remove it.
A
ISE cover
B
ISE LED
Figure E-2
ISE cover
A
B
Summary of Contents for Cedex Bio
Page 1: ...Cedex Bio System Operator s Manual Software Version 2 1...
Page 10: ......
Page 22: ...Roche Diagnostics A 14 Operator s Manual Version 3 1 1 Safety Cedex Bio System Safety labels...
Page 130: ...Roche Diagnostics A 122 Operator s Manual Version 3 1 4 Software Cedex Bio System Buttons...
Page 131: ...5 Daily operation B 3 6 Special operations B 91 7 Configuration B 133 Operation B...
Page 132: ......
Page 303: ...8 General maintenance C 3 Maintenance C...
Page 304: ......
Page 339: ...9 Messages and alarms D 3 10 Result flags D 23 11 Troubleshooting D 39 Troubleshooting D...
Page 340: ......
Page 392: ......
Page 471: ...Glossary F 3 Index F 11 Glossary and Index F...
Page 472: ......
Page 492: ...Roche Diagnostics F 22 Operator s Manual Version 3 1 Index Cedex Bio System...
Page 493: ...Revisions G...
Page 494: ......
Page 495: ...Roche Diagnostics Operator s Manual Version 3 1 G 3 Cedex Bio System 18 Revisions Revisions...
Page 496: ...Roche Diagnostics G 4 Operator s Manual Version 3 1 18 Revisions Cedex Bio System...