Roca NEOBIT 24/24 Operating, Cleaning And Maintenance Instructions Download Page 15

ATC 

ROC

Summary of Contents for NEOBIT 24/24

Page 1: ...PT IT DE FR Wall mounted gas boiler Operating Cleaning and Maintenance Instructions for the USER Chaudi re murale gaz Instructions de Fonctionnement de Nettoyage et Maintenance pour l UTILISATEUR Gas...

Page 2: ...r par un extracteur Nora 24 24 F Chaudi re avec service de Chauffage et d Eau Chaude Sanitaire instantan e avec changeur a plaques pour la production d ECS La combustion ne s effectue pas avec l air d...

Page 3: ...r prio local onde a caldeira est instalada Os gases da combust o s o evacuados para o exterior por um extractor Nora 24 24 F Caldeira com servi o de Aquecimento Central e gua Quente Sanit ria instant...

Page 4: ...ock 3 4 D DHW outlet 1 2 E Central Heating Flow Valve 3 4 F Safety valve pressure relief 3 bar 1 2 G DWH storage cylinder return 3 4 H DWH storage cylinder flow 1 2 A Retour de Chauffage 3 4 B Entr e...

Page 5: ...boiler 9 Flow governor of the heating circuit 10 Watter pressure switch 11 Safety valve 3 bar 1 Circulador 2 Man metro anal gico 3 Electrov lvula para mudan a AQS aquecimento central 4 Purgador autom...

Page 6: ...Nora e Sara 24 24 24 24 F e 24 24 T Aquecimento Central e gua Quente Sanit ria Caldeiras Nora e Sara 24 24 24 24 F e 24 24T Agua Caliente Sanitaria Domestic Hot Water Eau Chaude Sanitaire Hei wasser...

Page 7: ...acendida e iluminam se os leds C e E Seleccionar servicio A y temperatura de consigna D Select service A and temperature of setpoint D Choisir service A et temp rature de consigne D W hlen Sie Dienst...

Page 8: ...ne les leds C et E Der Heizkessel wird angez ndet und man beleuchtet Lichten C und E La caldaia accesa e si illuminano i leds C e E A caldeira acendida e iluminan se os leds C e E En caso de disponer...

Page 9: ...e servi o rode o comutador novamente Seguridades Safeties S curit s Sicherheitsfunktionen Dispositivi di sicureza Seguran as FR ES GB Antiinercias Despu s de cada servicio el circulador funcionar unos...

Page 10: ...installer or the service post sale For boilers of installed open camera and natural shot in the same enclosure that a bell extractor is necessary to respect the local legislation to this end FR ES GB...

Page 11: ...cuit of Heating Fill the circuit and then turn off well the filling tap Finally ask for service directly FR ES GB Se se acendem os leds de temperatura A e o led de anomalia B significa que a caldeira...

Page 12: ...Instructions It is advisable to call a qualified service engineer for the following operations Boiler start up The necessary adjustments and settings Verification that current regulations are complie...

Page 13: ...A T C R O C...

Page 14: ...A T C R O C...

Page 15: ...A T C R O C...

Page 16: ...2 6933 3 0106 CE Baxi Roca Calefacci n S L L Hospitalet de Llobregat 2005 A T C R O C...

Reviews: