background image

Issue 1 190814

1.Ensure mains supply is switched off before commencing 
   work.
2.Select suitable location for luminaire, 
3.Remove bracket from luminaire, mark wall with 
   appropriate fixing positions. Before drilling, ensure that the   
   hole does not impinge on pipe work, cables or other 
   building services.
4.Mount bracket on wall and re-attach luminaire
5.The luminaire is supplied with 0.5m of rubber cable. Using 
   suitable IP rated enclosure terminate Brown (Live), Blue  
   (Neutral) and Green/ Yellow (Earth) to switch supply.
6. This product has no user serviceable parts. If any part is 
    damaged, disconnect from mains and discontinue use.
   Note: No “fixings screws provided”, please use appropriate 
   fixings screws.

Page 1

HIGH POWERED LED FLOOD LIGHT
RLEDF80W-24

INSTRUCTION MANUAL

Model No. 

  

Power (W): 

 

 

Supply voltage:   
CCT:
Lumen:
CRI:
Beam Angle:
PF:  
Average Lamp Life: 
Safety Class:   
Ambient temp:    

 

Ingress Protection:
Depth (mm)

  

Width(mm):  

 

Height (mm): 

 

Weight (kg): 
Warranty: 
Compliance with:  

RLEDF80W-24   
80W 

 

                

100-240V~  50/60Hz 
4500K
5500lm
80
80

º

>0.9
35,000 Hours
Class I , Must be Earthed.
-15ºC <Ta < 40ºC 
IP65
112mm
285mm
360mm
5.6Kg
3 years

EN55015,EN60598-1,EN61000-3-2,
EN61000-3-3,EN61347-2-13,EN61547

                               

PLEASE READ INSTRUCTION BEFORE COMMENCING INSTALLATION AND RETAIN FOR FUTURE REFERENCES.
! Electrical products can cause death or injury, or damage to property. If in any doubt about the installation or
use of this product, consult a competent electrician
                                                                                                          Note:
                 Product technical information and specification may change over time without prior notification 
        For the latest technical information please visit our web site www.ledgrouprobus.com or robusdirect.com

Information for the Product user:

1. Please note the requirement to dispose of Waste Electrical & Electronic Equipment separately from household waste (WEEE marked with 

    crossed out wheelie bin symbol). 

2. Please consider your role in contributing to re-use and recycling by returning this product at end of life to a collection centre for waste electrical 

    equipment or a Civic Amenity site, or to a retail outlet from which you are purchasing a replacement.

3. This equipment may contain substances that are hazardous to health and the environment if disposed of carelessly.  It is important that it is   

    separated from normal household waste and recycled in the WEEE chain

4. The “crossed out wheelie bin symbol” on a product indicates this equipment must not be disposed of in normal household waste, but should be    

    disposed of according to local WEEE regulations

The Installation must be carried out by an electrician

LED Group

  

 

Western Retail Park 

         Tel: +353 1 7099000 

Nangor Road 

 

         Fax: +353 1 7099060

Dublin 12  

 

         Email: [email protected] 

Ireland   

 

         Website: www.led.ie

ISO 9001:2008

Q UAL IT Y ASSU RED CO MPANY

Specifications

Installation:

Projection distance:        25m - 30m
Max projection area:       30m x 12m
Mounting height:              4m - 8m

Reviews: