Features and technical data
12
1
Figure 1.4
Electrical wiring diagram for G100
SF Blower
SCH1
Control board
SCH2
Motor board
S
Heat exchanger temperature probe
RLZ Flame sensor
EV Gas solenoid valve
TR Ignition transformer
V1-V2
Fan
STF Flue gas temperature probe
TL Limit thermostat
AC Ignition electrodes
P1 Earthing
CR Chronothermostat
1
Brown
2
Red
3
Blue
4
Pink
5
Grey
6
Yellow
7
Green
8
White
9
Black
10 Purple
1 2 3 4 5 6
N
X12
CR
N
SF
L
1
5
~
X15
X3
X17
X16
X22
X18
N
TR
P3
N
X19
FUSE 2A
T3
T3
T2
T1
L1
N1
X7
P1
T5
X7
EV
RLZ
AC
COM
MIN
MED/MIN
MED/MAX
MAX
FUSE 6.3A
X13
L
N
GND
X5
X6
X3
X1
L
N
K4
K3
K2
X7 X10
X9
X11
X8
C
1
2
3
4
F1
K1
X9
SCH1
SCH2
IN 230V 50Hz
GND
V1
V2
~
~
TL
S
STF
LD1
1.4
CONTROLS
1.4.1
Control device
The unit operation is controlled by the supplied digital
chronothermostat.
For further information please refer to Paragraph