Palletizing Solution - Instruction Manual
8. Connect the 8 mm air tube to the vacuum generator. Follow the steps bellow:
Step #1
Step #2
Step #3
Insert the air tube in the AirPick port
Insert the safety clip
Ensure the safety clip is properly
installed
Info
Use dry and filtered air only. Follow standard ISO 8573-1, class 3.4.3. We recommend using a local pressure regulator with a
filter and air dryer.
9. Use the spiral cable sleeve to keep the air tube and the coupling cable together.
10. Plug the other extremity of the air tube to your local air supply devices.
Caution
l
Maximum pressure allowed is 7 bar (recommended pressure is 6.5 bar).
l
We recommend using a local pressure regulator with a filter and an air dryer.
11. Install the small cover on the side of the column with the provided screws.
41
Summary of Contents for PALLETIZING SOLUTION
Page 12: ...Palletizing Solution Instruction Manual 12...
Page 72: ...6 1 2 AirPick Vacuum Gripper Fig 6 1 AirPick general dimensions 72...
Page 73: ...Palletizing Solution Instruction Manual 6 1 3 Extra Reach Bracket 73...
Page 74: ...6 1 4 Bracket for two 2 Suction Cups Fig 6 2 Two air nodes bracket s dimensions 74...
Page 80: ...80...
Page 95: ...1 2 2 Safety Connections Fig 12 2 Universal Robots Controller Safety Connections Schema 95...