N. Go to the Bypass Setup screen and initiate the setup sequence. Note that this process
may take up to approximately 5 minutes and you cannot abort this sequence.
O. Go to the Programming menu and program all temperature setpoints and schedules for
each zone. Refer to section 5.2 for programming features.
P. Return to the Main Menu. System is ready to operate. Place the system mode of operation,
fan control, and schedule to the desired settings.
SlimZone Premier
25
Setup
Panel
Bypass
3
2
Are you sure ?
Yes
No
Bypass setup
Step 06
Wait 30
You may abort the
sequence here.
Summary of Contents for DSL-520P
Page 1: ...ZONE CONTROL SYSTEM INSTALLATION AND OPERATION MANUAL ...
Page 8: ...Figure 3 1 Typical System Diagram SlimZone Premier 5 AND ACCESSORIES OPTIONAL ACCESSORIES ...
Page 11: ...8 SlimZone Premier Figure 4 2 SZP Wiring Diagram ...
Page 12: ...SlimZone Premier 9 EMERGENCY ...
Page 32: ...Zone Schedule SlimZone Premier 29 ...
Page 33: ...SLIMZONE PREMIER SZP ZONE DIAGRAM 30 SlimZone Premier ...