CRV-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
38 of 83
9.2.3 Vertical Ventin
g
See Page 39, Figure 18
for recommended
v
ertical
v
enting options.
9.2.4 Horizontal Ventin
g
See Page 40, Figure 19
through Page 42, Figure 21
for recommended horizontal
v
enting options.
9.2.5 Len
g
th Re
q
uirements
See EP-100, EP-200 or EP-300 P
u
mp Series
Installation, Operation and Ser
v
ice Man
u
als for
complete
v
enting options.
Vent lengths are allo
w
ed as follo
w
s:
Seal all pipe joints
w
ith high temperat
u
re silicone
sealant in the
v
ent pipe. Ins
u
lation and additional
sealing meas
u
res
w
ill be req
u
ired.
Optional heat exchanger lengths are considered as
v
ent length for length determination.
S
u
btract 15' (4.6 m) of maxim
u
m allo
w
ed
v
ent or
o
u
tside air d
u
ct length per
v
ent elbo
w
if more than
three are
u
sed.
9.2.6 Vent Material Recomendations
Vent recommendations in order of preferred
u
se:
1. Porcelain coated t
u
bing 4'' (10 cm) O.D.
(P/N 9141030D)
2. Heat treated al
u
minized t
u
bing 4'' (10 cm) O.D.
(P/N 91409408)
Heat treated al
u
minized t
u
bing 6'' (15 cm) O.D.
(P/N E0009105)
3. Single
w
all fl
u
e pipe - minim
u
m 26 ga.
(Not s
u
itable for mod
u
lating and condensing
system designs.)
Vent Len
g
th
EP-300 Vent
Size
EP-200 Vent
Size
EP-100 Vent
Size
Up to 10' (3 m)
6" (15 cm) -
1 elbo
w
4" (10 cm) -
1 elbo
w
-
Up to 25' (8 m)
7" (18 cm) -
3 elbo
w
5" (12.7 cm) -
3 elbo
w
s
4" (10 cm) -
3 elbo
w
s
Up to 50' (15 m)
8" (20 cm) -
3 elbo
w
6" (15 cm) -
3 elbo
w
s
5" (12.7 cm) -
3 elbo
w
s
Summary of Contents for CoRayVac CRV-B-10
Page 2: ......
Page 4: ......
Page 6: ......
Page 71: ...SECTION 13 STARTING THE SYSTEM 65 of 83 FIGURE 42 Vacuum Reading ...
Page 81: ...SECTION17 TROUBLESHOOTING 75 of 83 17 1 Troubleshooting Flow Chart ...
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......