background image

 

 

 

 

Page: 2 

 

 

 

 

 

PACKAGING 

All care is taken when packing and Roband ensures that every unit is functional and 
undamaged at the time of packaging. 

The Package of this Bain Marie should include: 

1) 

One Bain Marie ( appropriate model) 

2) 

Pans & Lids (appropriate number if ordered) 

3) 

This Manual 

4) 

Packaging Materials 

Any  damage  to  the  machine  as  a  result  of  freight  must  be  reported  to  the  Freight 
Company and to the agent responsible for the dispatch of said unit within 24 hours of 
receipt.  No claims will be accepted or entertained after this period. 

 

 

 

 
 
RCM: 

Roband

®

 products have been designed and manufactured to comply with any and 

all  specifications  set  out  by  the  Australian  Communications  and  Media  Authority 
(ACMA)  in  regards  to  Electromagnetic  Compatibility.    As  testament  to  such 
compliance these units bear the RCM symbol. 

For  further  information  contact  the  Australian  Communications  Authority,  PO  Box 
13112, Law Courts, Melbourne VIC 8010. 

 

 

 

COMPLIANCE 

 

Summary of Contents for BM14

Page 1: ... Special Features Ultra Durable Stainless Steel Elements Designed to take many combinations of pans Wet or Dry Operation Thermometer Display These instructions cover the models of ROBAND Bain Maries listed above only Although there are slight variances between models the installation operation care and maintenance procedure is the same for all ...

Page 2: ...ermission of the publisher The material contained within this document is intended entirely for instructional purposes Roband Head Office Sydney Australia Roband Australia Pty Ltd Tel 61 2 9971 1788 1 Inman Road Fax 61 2 9971 1336 Dee Why NSW 2099 Email sales roband com au AUSTRALIA Web www roband com au International Agents For additional agents please email Head Office Cyprus United Catering Equ...

Page 3: ...ENTS INTRODUCTION 1 GENERAL PRECAUTIONS 1 PACKAGING 2 COMPLIANCE 2 INSTALLATION 3 GENERAL SAFETY 5 CLEANING CARE MAINTENANCE 6 TROUBLESHOOTING 7 SPECIFICATIONS 8 CIRCUIT DIAGRAM 9 APPENDIX A 10 WARRANTY 12 ...

Page 4: ...ical sensory or mental capabilities or lack of experience or knowledge unless they have been given supervision or instruction concerning the safe use of the appliance by a person responsible for their safety These machines are heating units and as with any commercial heating unit the surfaces on these units will get hot Always be careful when near an operating Bain Marie and ensure that any risk t...

Page 5: ... the Freight Company and to the agent responsible for the dispatch of said unit within 24 hours of receipt No claims will be accepted or entertained after this period RCM Roband products have been designed and manufactured to comply with any and all specifications set out by the Australian Communications and Media Authority ACMA in regards to Electromagnetic Compatibility As testament to such comp...

Page 6: ...nsure that all the controls are in the OFF position For models BM14 BM15 BM16 BM22 BM23 plug the Bain Marie into a standard single phase 10Amp power point For models BM24 BM25 BM26 plug the Bain Marie into a standard single phase 15Amp power point National Standards exist outlining the positioning spacing and ventilation requirements when installing new appliances These Standards should be consult...

Page 7: ... energy regulator on HIGH for extended periods The build up of excessive heat may damage the thermometer WET OPERATION For wet operation the most important factor is the volume of water placed in the tank The tank should be filled with fresh clean water to a level where it just touches the bottom of the element The water level should not be so high as to touch the undersides of the pan If the wate...

Page 8: ...his unit can get very hot ensure everyone is aware that the machine is operating and take care to avoid contact with hot surfaces National Standards exist outlining the positioning spacing and ventilation requirements when installing new appliances These Standards should be consulted and new equipment should be installed accordingly In any situation where specifications allow a distance of less th...

Page 9: ...the Bain Marie use hot soapy water with a clean sponge or cloth We recommend this be done daily to prolong the life of the element and tank Do not use a metal scourer In some areas hard water may cause a residue to build up on the surface of the tank and element This should removed to prevent any corrosion to the tank and or element failure CAUTION Although every care is taken during manufacture t...

Page 10: ...s plugged in correctly and the power id switched on The power point is not faulty The thermostat is not in the OFF position The Thermostat knob is not loose or broken rendering the thermostat inoperable Check Appendix A on page 10 of this manual RCD S Only after all these points have been checked should you call for service ...

Page 11: ...6 220 240 Volts AC 50 60Hz 1680 2000 Watts 1665 408 255 BM22 220 240 Volts AC 50 60Hz 1100 1300 Watts 705 615 255 BM23 220 240 Volts AC 50 60Hz 1680 2000 Watts 1030 615 255 BM24 220 240 Volts AC 50 60Hz 2520 3000 Watts 1355 615 255 BM25 220 240 Volts AC 50 60Hz 2605 3100 Watts 1680 615 255 BM26 220 240 Volts AC 50 60Hz 2605 3100 Watts 2005 615 255 Constant Research Development may necessitate mach...

Page 12: ...M16 BM22 BM23 BM25 BM26 NOTE This circuit diagram has been provided for reference and to assist qualified service and repair agents only Under no circumstances should person s not suitably qualified attempt repairs to any electrical equipment ...

Page 13: ... should be taken to ensure that the sum of the leakage currents of electrical equipment on the load side of an RCD is less than 1 3 of its rated residual current To avoid excessive leakage current causing unwanted tripping where socket outlets are protected by one RCD having a rated residual current not greater than 30mA consideration should be given to the number of socket outlets protected and t...

Page 14: ...Page 11 NOTES ...

Page 15: ...ive goods or materials pursuant to this warranty must be authorized by Roband Australia prior to any action being taken The company reserves the right to reject a claim for warranty if it is not completely satisfied with the circumstances under which it occurred and any other costs incurred for false claims or faults due to incorrect usage etc are the responsibility of the claimant Roband Australi...

Page 16: ... LEADING PRODUCTS AVAILABLE PLUS PIE FOOD WARMERS DRINK MIXERS HIGH PERFORMANCE DEEP FRYERS VITAMIX BLENDERS GRILLMAX TOASTERS NOAW Slicers Manufactured Imported in Australia by Authorised Distributor Agent ...

Reviews: