Operating and Assembly Instruction 

 

Linear conveyor  

 

PARU 

 

 

Summary of Contents for PARU

Page 1: ...Operating and Assembly Instruction Linear conveyor PARU...

Page 2: ...scription 5 2 1 General information 5 2 2 Technical data 5 2 3 Description of functions 7 3 3 Mounting Instructions 8 3 1 Transportation 8 3 2 Assembly 8 3 3 Bringing into service 8 4 Operation Instru...

Page 3: ...4 35 EU Low Voltage 2014 30 EU Electromagnetic Compatibility EN 614 1 2006 A1 2009 EN ISO 13857 2008 EN 619 2002 A1 2010 EN ISO 14120 2015 EN 620 2002 A1 2010 EN 60204 1 2006 EN ISO 12100 2010 The rel...

Page 4: ...and are used for the controlled feeding of bulk materials for automatic acceptance by a downstream process e g handling device or separation Any other use or structural modification of PARU is not con...

Page 5: ...please contact our customer service vertrieb rna de 2 Product description 2 1 General information PARU is a standardized platform for the correct individual supply of bulk materials in automated produ...

Page 6: ...ht Figure 2 Dimensions of PARU structure u left and structure u wide right Other technical data of the superstructure S1 b S1 b wide S1 u S1 u wide dimensions LxBxH mm 430 x 120 x 140 430 x 140 x 140...

Page 7: ...ss and the tooling Due to this movement the conveyed goods are accelerated in horizontal and vertical direction and move along the tooling PARU oscillates in the range of 100Hz the amplitude in vertic...

Page 8: ...djustment and assembly work agreed individually with the cus tomer Attention When placing the PARU on the target substructure the temporary parking area or the target machine into which PARU is to be...

Page 9: ...orrectly set If this is not the case please contact Rhein Nadel Automation GmbH Note The optimum conveying capacity of the PARU for one or more of the customer s conveyed goods has already been determ...

Page 10: ...to the upstream and downstream process is adjusted accurately 7 feeding of the conveyed goods into the upstream process Operation of the PARU according to chapter 4 1 of these operating and assembly i...

Page 11: ...s but the PARU does not run A First check whether 1 the settings on the control unit are correct frequency amplitude 2 the tooling is installed in its original condition and correctly positioned witho...

Page 12: ...handling systems ch Pol Ind Famades c Energia 23 E 08940 Cornella de Llobregat Barcelona Spanien Tel 34 0 93 377 7300 Fax 34 0 93 377 6752 E Mail info vibrant RNA com www vibrant RNA com www vibrant...