Dimensions and drilling plan for the assembly
Measurement diagram
24
SYCON
3000 H
Dimensions and drilling plan for the assembly
For the wall mounting of the ana-
lyser, the 4 enclosed brackets
must be fitted onto the instrument
with the aid of the 4 screws.
Use 8 mm dowels and wood
screws of 4.0 x 45 mm for the
wall mounting.
The brackets can be mounted
twisted 90° to the left or right.
For mounting on a plate, the in-
strument can be mounted from
the rear side without brackets.
Use M5 screws. The depth of the
threaded bushings is 20 mm.
The door hinges are on the left-
hand side.
Measurement chart
272
300
14
130
180
272
Brackets (4)
3
7
2
4
2
0
4
0
0
sensor -receiver
measuring section
exhaust
circulation pump
indicator leval
dosing pump
injector
actor - red transmitter LED
sieve
intake plug
outlet plug
indicator bottle
input valve