
22 • Chapter 4: Startup and Operation
AirLink 7010 Gas Monitor Operator’s Manual
Chapter 4: Startup and Operation
Power On/Off
Powering on the device activates its functions. When powered on, the device is fully functional and
access to system and settings menus is allowed.
CAUTION:
The internal components can be static sensitive. Use caution when opening the enclosure
and handling internal components.
Once power is supplied to the AirLink 7010—by being plugged into an AC outlet or by being wired to
a DC power supply—the display screen and LEDs will illuminate.
To cycle the Terminal Board power, flip the Power Switch (located on the lower right side of the
Terminal Board) to the OFF (and then ON) position.
Figure 11: Power Switch Location