background image

 

 

For detailed handling procedures and functions, refer to separate 

COM-JC 

[For SRZ]

 

Instruction Manual (IMR01Y34-E

†

)

.  

The manual can be downloaded from the official RKC website: 

http://www.rkcinst.com/english/manual_load.htm. 

 

CC-Link Communication Converter

 

 

 

IMR01Y26-E2

 

In order to achieve maximum performance and ensure proper operation of your new 
instrument, carefully read all the instructions in the manual. Please place this manual 
in a convenient location for easy reference. 

 

This manual describes the basic operation only. 

 

 

 

 

 

 

 

 

1. HANDLING PROCEDURES 

 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

To avoid error at operation start-up, COM-JC must be powered on LAST 
(after the Controller, PLC, etc.).

 

 

2. COMMUNICATION SETTING

 

 
 

Do not separate the mainframe from the terminal base with the power turned 
on. If so, instrument failure may result.

 

 

2.1  Station Number Setting 

Set the station number of CC-Link using a small blade screwdriver. 

 

 

Setting range: 

 

1 to 61 ( 4 stations occupied 1 time, 

 

 

4 stations occupied 2 times, 

 

 

4 stations occupied 4 times) 

 

1 to 64 (1 station occupied 1 time) 

Factory set value: 0 

Station number 

setting switch 

High-order digit 

setting 

(Set value 

×

 10) 

Low-order digit 

setting 

(Set value 

×

 1) 

 

 

When set to any value out of the setting range, the COM-JC becomes the 
FAIL state. 

  

2.2  Communication Speed Setting 

Set the communication speed of CC-Link using a small blade screwdriver. 

 

Left side 

Communication speed 

setting switch 

Setting range: 0 to 4 
Factory set value: 0 (156 kbps) 

 

 

When set to any value out of the setting range, the COM-JC becomes the 

FAIL state. 

 

Communication speed and maximum transmitter distance 

[Use the CC-Link dedicated cable Ver. 1.10] 

Communication speed 

setting 

Communication speed  Maximum transmitter 

distance 

0 156 

kbps 

1200 

625 kbps 

900 m 

2.5 Mbps 

400 m 

5 Mbps 

160 m 

10 Mbps 

100 m 

 

2.3  Occupied Stations/Extended Cyclic and   

 

Controller Communication Speed Setting 

Set the number of occupied stations/extended cyclic and controller communication speed.   

 

 

Left side 

 

Dip switch 

ON

OFF

1 2 3 4 5 6 7 8

ON 

1 2 3 4 5 6 7 8

ON 

 

 

Controller communication speed 

OFF

OFF 38400 

bps 

ON OFF 

9600 

bps 

OFF

ON 19200 

bps 

ON ON 

38400 

bps 

Factory set value:  19200 bps 

 

Number of occupied stations/extended cyclic setting

OFF

OFF  OFF 

4 stations occupied 1 time  (8 channels assignment) 

ON 

OFF  OFF 

4 stations occupied 1 time  (16 channels assignment) 

OFF

ON 

OFF 

4 stations occupied 2 times  (16 channels assignment) 

ON 

ON 

OFF 

4 stations occupied 2 times  (32 channels assignment) 

OFF

OFF 

ON 

1 station occupied 1 time 

(1 channel assignment) 

ON OFF ON 1 

station 

occupied 

1 time 

(2 channels assignment) 

OFF

ON 

ON 

4 stations occupied 4 times  (32 channels assignment) 

ON 

ON 

ON 

4 stations occupied 4 times  (64 channels assignment) 

Factory set value:  4 stations occupied 1 time (8 channels assignment) 

 

6 7 8 

 

OFF

OFF OFF 

Fixed 

 

3. CC-Link FLAG OPERATION

 

Remote input/output and remote register flag operations are as follows. 
[Example]  When the occupied station/extended cyclic of COM-JC is set to 4 stations 

occupied 1 time. 

 

„

 

Initialize request processing at power on 

z

 

Initialize processing request from remote device station (COM-JC) 

If the COM-JC is initialized at power on, the initialize data processing request flag [RX(n+7)8] 
is turned on. Thus, turn on the initialize data processing completion flag [RY(n+7)8]. 
When COM-JC becomes a ready state, a remote ready [RX(n+7)B] is turned on. 

ON

 

OFF

 

ON

 

OFF

 

ON

 

OFF

 

Initialize data processing 
request flag [RX(n+7)8] 

Initialize data processing 
completion flag [RY(n+7)8] 

Remote ready [RX(n+7)B] 

 

z

 

Initialize processing request from master station (PLC) 

This is a COM-JC initialize setting request. As there is no initialize data specifically, no 
processing is required. 

ON

 

OFF

 

ON

 

OFF

 

ON

 

OFF

 

Initialize data setting  
request flag [RY(n+7)9] 

Initialize data setting 
completion flag [RX(n+7)9] 

Remote ready [RX(n+7)B] 

 

 

„

 

Error flag/error reset processing 

If the Error reset request flag [RY(n+7)A] is turned on while the Error status flag [RX(n+7)A] 
is turned on, the Error status flag history is cleared and the flag [RX(n+7)A] turns off. 

Error status flag

 

[RX(n+7)A]

 

Error reset 

request flag

 

[RY(n+7)A]

 

Remote ready

 

[RX(n+7)B]

 

ON

OFF

ON

OFF

ON

OFF

 

 

„

 

Extension number for display selection processing 

After the extension number for display [RYn0 to RYn5, RY(n+1)0 to RY(n+1)2] is set, turn 
on the extended display flag [RYnC]. After the data in the remote register [RWrn to 
RWrn+F] is displayed, check that extended display completion [RXnC] is turned on and 
then turn off the extended display flag [RYnC]. If the extended display flag is turned off, the 
extended display completion is turned off. 

ON

OFF

ON

OFF

ON

OFF

ON

OFF

Extension number 
for display 
[RYn0 to RYn5, 

RY(n+1)0 to RY(n+1)2]

Extended display flag
[RYnC]

 

Extended display
completion 
[RXnC]

 

Remote register 
[RWrn to RWrn+F]

 

(R/O data: Automatically updated) 

Extension number 0

Extension number 0

Extension number 1

Extension number 1 

 

 

„

 

Extension number for setting selection processing 

The content of the extended setting remote register is selected and the set value is changed. 
After the extension number for setting [RYn6 to RYnB, RY(n+1)8 to RY(n+1)A] is set, turn 
on the extended setting flag [RYnD]. After the content of the remote register [RWwm to 
RWwm+F] is set, check that extended setting completion [RXnD] is turned on and then 
turn off the extended setting flag [RYnD]. If the extended setting flag [RYnD] is turned off, 
the extended setting completion [RXnD] is turned off. 

 

ON

OFF

ON

OFF

ON

OFF

ON

OFF

Data usage

 

Data usage

 

Extension number 
for setting 
[RYn6 to RYnB, 

RY(n+1)8 to RY(n+1)A]
Extended setting flag

(Setting update flag) 
[RYnD]

 

Extended setting 
completion 

[RXnD]

 

Remote register 
[RWwm to RWwm+F]

 

 

Regardless of the number of occupied stations and the extended cyclic, the 
above processing is also necessary if the “Set value (SV)” assigned to the 
remote register (RWw) as a fixed value is changed. 

 

„

 

AT start procedure 

Instructs AT execution. 

 

Extended setting flag

(Setting update flag) 
[RYnD]

 

ON

OFF
ON

OFF

ON

OFF

ON

OFF

Data = 1

 

Data = 0

 

Remote register [RWwn]

(Extension number 4: 
PID/AT transfer)

 

Extended setting 
completion 
[RXnD]

AT setting status

PID/AT transfer status

[RXn4]

 

For remote input/output and remote register, refer to 

COM-JC [For SRZ] 

Communication Data List (IMR01Y30-E

†

)

 or 

COM-JC [For SRZ] 

Instruction Manual (IMR01Y34-E

†

)

.

 

4. USAGE EXAMPLE 

A usage example of CC-Link communication is described in the following. 

4.1 System 

Configuration 

In this usage example, described the following system configuration. 

 

CC Link Ver. 1.10

Controller 

communication

 

(RS-485: Modbus)

Controller

  

(Z-TIO module)

Module address * 
(Controller address) 

 

*  The value obtained by 

adding “1” to the set 
address corresponds 
to the address  used 
for

 

the actual program.

(Set value: 0 and 1) 

1

2

PLC  (Mitsubishi Electric  

MELSEC Q series)

 

CPU unit 
Q02HCPU

 

CC-Link system Master local unit
QJ 61BT11N (Master station) 
Station number: 0 
Communication speed: 156 kbps

CC-Link communication 

converter COM-JC 
Remote device station 

(Slave station) 
Station number:  1 
4  station occupied 1  time 
Communication speed: 

156 kbps

 

 

 

„

 

Use instruments 

  CC-Link communication converter:  COM-JC ............................................ 1 

  Controller (SRZ): 

Z-TIO module (4 channels type) ....... 2 

  Mitsubishi PLC MELSEC Q series 

 CPU unit: 

Q02HCPU 

  CC-Link system master local unit:  QJ 61BT11N 

  CC-Link dedicated cable Ver. 1.10 

  COM-JC and controller connection cable 

 

4.2  Setting the Instruments Used   

Set the PLC, COM-JC and controller as the following. 

„

 

PLC setting 

 

For operation of the CC-Link system master local unit QJ61BT11N and MELSEC 

sequencer programming software GX Developer, refer to Instruction Manual of PLC. 

 

[CC-Link system master local unit QJ61BT11N setting] 

Setting item 

Setting value 

Station number 

CC-Link communication speed  156 kbps 

 

[Master station network parameter setting by GX Developer] 

Setting item 

Setting value 

Number of boards in module 

Start I/O number 

0000 

Operational settings 

Parameter name: 

None 

Data link disorder station setting:  Clear 

Case of CPU STOP setting: 

Refresh 

Type Master 

station 

CC-Link mode setting 

Remote net (Ver. 1 mode) 

Total number of connected 

modules 

Number of retries 

Number of automatic return 

modules 

Standby master station number  Blank 
Operation specification when 

CPU is down 

Stop 

Scan mode specification Asynchronous 
Delay time setting 

10 (500 

μ

s) 

Station information 

(Number of COM-JC 

connection: 1 

Station number: 1) 

Station type: 

Remote device 

 station 
Expanded cyclic setting: 

Single 

Number of occupied stations:  Occupies 4 stations

Remote station points: 

128 points 

Reserved/invalid station select:  No setting 

Intelligent buffer select (word):  No setting 

 

[Automatic refresh parameter setting by GX Developer] 

Setting item 

Setting value 

Remote input (RX) refresh device 

X1000 

Remote output (RY) refresh device 

Y1000 

Remote register (RWr) refresh device 

W0 

Remote register (RWw) refresh device 

W100 

Special relay (SB) refresh device 

SB0 

Special register (SW) refresh device 

SW0 

 

All Rights Reserved, Copyright 

©

 2007, RKC INSTRUMENT INC. 

CAUTION 

Communication setting 

Mounting and Wiring 

Controller setting 

Program creation 

Refer to 

2. COMMUNICATION SETTING

 

 Refer to 

COM-JC [For SRZ] Installation Manual 

(IMR01Y22-E

†

)

 

  For SRZ, refer to 

Z-TIO Instruction Manual (IMS01T01-E

†

)

 

and

 Z-DIO Instruction Manual (IMS01T03-E

†

).

 

Refer to 

4.4 Sample Program

 

 Refer to 

4.2 Setting the Instruments Used

   

 Refer to 

Z-TIO Host Communication Quick 

Instruction Manual (IMS01T02-E

†

)

 and

 Z-DIO 

Instruction Manual (IMS01T03-E

†

).

 

PLC setting 

Refer to 

4.2 Setting the Instruments Used

   

Device assignment 

Refer to 

4.3 Device Assignment Example

 

 

 

 

COM-JC

 

[For SRZ]

 

Quick Instruction

Manual

 

 

Reviews: