background image

Made in Viet Nam

Page 1 of 3

8 pcs.

email:     [email protected]

FURNITURE

Riverside

Hardware and Parts packed with the King Storage Footboard

Hardware and Parts packed with the 5/0-6/6 Bed Rails

8 pcs.

8 pcs.

5

16

-18 x 3-1/2

" Long

All-Thread Bolt

8 pcs.

Queen / Eastern King
Bed Rail

2 pcs.

R-A

R-B

R-C

R-D

R-E

R-F

1 pc.

Ø

5

16

-18  Hex Nut

12mm Open Wrench

Vogue Bed Room

King Bed

Assembly Instructions

Ø

5

16

 x 12 x 3mm

Spring Washer

8 pcs.

Hardware and Parts packed with the 6/0  California King Bed Rails

8 pcs.

8 pcs.

Ø

5

16

-18 x 3-1/2

" Long

All-Thread Bolt

8 pcs.

California King Bed
Rail

2 pcs.

R-A

R-B

R-C

R-D

R-E

R-F

1 pc.

Ø

5

16

-18  Hex Nut

12mm Open Wrench

Ø

5

16

 x 12 x 3mm

Spring Washer

R-G

1 pc.

4mm Allen Wrench

46180
       

TALL UPH HEADBOARD

461184
    

  TALL PANEL HEADBOARD

46185  6/0-6/6  FOOTBOARD
46172  5/0-6/6 BED RAILS --OR--
46182  6/0 BED RAILS

M5/16" x 16*2mm
Flat Washer

M5/16" x 16*2mm
Flat Washer

6/0-6/6 Wood Slat
77" Long

#8 x 1" Wood
Screw

Slat Support Leg
9-1/2" long
with leveler

F-A

F-B

F-C

F-D

King Footboard

46185  6/0-6/6  FOOTBOARD
46172  5/0-6/6 BED RAILS --OR--
46182  6/0 BED RAILS

4 pcs.

8 pcs.

8 pcs.

1 pc.

R-G

1 pc.

4mm Allen Wrench

R-G

Slat Support
Cleat

Be sure to check all packing material carefully for small parts, which
may have come loose inside the carton during shipment.  

To prevent

possible scratches or damage, this furniture should be assembled on a soft

surface such as a blanket or carpet. 

It is recommended that two people are

used to assemble and set-up this bed.

Filler Rail

Note: For a Standard Bed, the Wood Slat Support
Cleat mounted on the back side of the Bed Rails must
be mounted at the lower location. If needed, using the
Allen Wrench (R-G) remove the Bolts and Washers
and remount it at the lower position on the Bed Rails.

Reviews: