background image

Made in Viet Nam

email:    [email protected]

Components and Hardware List

Page 1 of 2

44732

Executive Desk

Allegro

 Home Office

Assembly Instructions

A

B

C

D

4 sets.

File Rod & Clips

1 pc.

Grommet

Bun Foot W / Leveler

8 pcs.

2 sets.

Key

E

F

Center Drawer Divider

Top Drawer Divider

4 pcs.

4 pcs.

Be sure to check all packing material carefully for small parts,which
may have come loose inside the carton during shipment.

Step 1 : Place the desk on a clean, soft surface such

as a blanket or carpet. Remove and discard the shipping

rail attached to the bottom of the desk .

WARNING

Pinch Point.

Keep fingers

from underneath

drawer front

when releasing.

Remove the screws and

discard the shipping rail.

G

Pencil Tray

1 pc.

A

Reviews: