STEP 5
STEP 6
1. Insert 4 wood dowels (A) into wood dowel holes on middle shelf (8).
2. Attach middle shelf (8) to pre-assembled middle shelf rail boards (3, 4, 10) by inserting wood
dowels (A) into wood dowel holes on middle shelf rail boards (3, 4, 10).
3. Insert 7 screws (D) through holes on middle shelf (8) and tighten to middle shelf rail
boards (3, 4, 10).
1. Insert 4 wood dowels (A) into wood dowel holes on bottom shelf (9).
2. Attach bottom shelf (9) to pre-assembled bottom shelf rail boards (5, 6, 10) by inserting wood
dowels (A) into wood dowel holes on bottom shelf rail boards (5, 6, 10).
3. Insert 7 screws (D) through holes on bottom shelf (9) and tighten to bottom shelf rail boards
(5, 6, 10).