INSTALLATION

Side Curtains

NOTE:

620NH side curtain shown Installation of 620G 

side curtain is identical

NOTE:

Always align outside touch and hold fastener 

flap (A1, A2) first.

 B

 A1

 A2

Top View

A1, A2

 B

1  Position top edge of side curtain approximately 

1in [25mm] above the top edge of the side frame 
and secure in place by pressing the touch and hold 
fastener on the outside mounting flap (A1) to the 
mating touch and hold fastener on the outside of the 
side frames (A2)

NOTE:

When attaching the side curtain at the top,  

DO NOT

 let the weight of the side curtain hang on the 

side frame until at least 24in [610mm] of the touch and 
hold fastener is connected

2  Make sure that the mounting flap on the outside of 

the side curtain completely covers and is properly 
aligned with the touch and hold fastener on the side 
frame

3  Continue to align the mounting flap to the outside of 

the side frame touch and hold fastener and continue 
working downward to the bottom of the side frame 
Keep continuous downward pressure on side curtain 
to avoid wrinkles in fabric

4  Starting at the top, repeat Steps 1 and 2, with the 

inside mounting flap (B) The side curtain must be 
perpendicular to the side frame when finished

 C

5  Attach the side curtain pocket to the canopy 

installation chain (C)

•  First, run the “S” hook link part of the chain through 

the loop on the pocket located at the top, backside 
of the side curtain

•  Run the chain coming in the loop from the top Pull 

the chain just short of putting tension on the pocket

•  Take the “S” hook link and hook back onto the chain 

Make sure chain is not tangled “S” link does not 
have to be closed, but can be if desired

Do this for both sides

Figure 13 

Figure 14 

Summary of Contents for Eclipse 620G

Page 1: ...00129 Model 620G 620NH Publication AMEN00141 2019 11 22 NOTICE TO USER 2 SAFETY 3 INSTALLATION Overview 4 Preparation 5 Mounting Methods 5 Side Frames 6 Canopy Header 8 Side Curtains 12 Weighted Seal...

Page 2: ...by an authorized Rite Hite representative A Planned Maintenance Program P M P customized to your specific operation is available and recommended For a P M P contact your local Rite Hite representative...

Page 3: ...e environment or cause the equipment to operate improperly NOTE A note is used to inform you of important installation operation or maintenance information Lockout Procedure Barricade work area and po...

Page 4: ...Overview 1 Unpack and inspect unit 2 Install side frames and bracket anchors 3 Install side arms front bar and canopy top 4 Install side curtains and pocket straps 5 Install gutter roller seal and wea...

Page 5: ...lag bolt or anchor bolt through bolt method of attachment is required NOTE To determine anchor length use anchor manufacturer s recommendation for minimum anchor embedment Metal Sided Building Throug...

Page 6: ...wall at the bottom of the door opening or at dock level This mark is for the outside edge of the side frame Measure at dock level from this mark outside edge of the side frame across the door opening...

Page 7: ...allation 3 on each side of each side pad Figure 5 Example Line up the mounting hole on the bracket with a mortar joint on the wall and attach the mounting bracket to the side frame backer board Attach...

Page 8: ...bar assembly together and position across the installed side frames and mounting brackets Position it on top so the side arms on the top frame are facing the wall and land between the mounting bracket...

Page 9: ...corners where the canopy top and end cap meet are laying correctly over the edge of the mounting bracket 6 Drape canopy cover over the front bar the 2 1 2in 65mm square tubing Make sure the canopy cov...

Page 10: ...late and pipe spacers as needed on the inside of the wall so the mounting bar and the wall will flex together If structure is not aligned with 1 of the pre drilled mounting holes Drill new hole which...

Page 11: ...pare to value in the PAF If the front bar needs to be raised adjust the pin location I in the pivot arm extension NOTE Typically the bottom of the front bar is at least 12in 305mm higher than the tall...

Page 12: ...p on the outside of the side curtain completely covers and is properly aligned with the touch and hold fastener on the side frame 3 Continue to align the mounting flap to the outside of the side frame...

Page 13: ...r Seal_191004 pdf A E Roller Seal Assembly Canopy Top B D C NOTE Canopy removed for clarity 1 Position roller seal assembly so that center tabs A and top edges are aligned the full width B with the ca...

Page 14: ...1 Insert gutter panels A1 A2 in pocket B located behind 4in 102mm touch and hold fastener on weighted seal Slide 1 HMWPE panel right A1 and 1 HMWPE panel left A2 to fill entire width of pocket 2 Secu...

Page 15: ...of center foam block A A 4in 100mm overlap Flap Eclipse Manual Wear Panels_191004 pdf 1 2in 13mm MAX Side View Roller Seal Assembly Corner Wear Panel Center Wear Panel Assembly Washer Fastener Gutter...

Page 16: ...A Secure each front flap 2 1 1 4in self drill tap screws with washers Secure each corner wear panel inside screw goes through center wear panel assembly and corner wear panel 3 2in self drill tap scre...

Page 17: ...lts with expansion collar or equivalent fastener 4 anchors per bumper required Collapsible Style Draft Pad B D C D A2 A1 1 Open attachment flap s on side member A1 and back of side curtain A2 2 Align...

Page 18: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 18 Publication AMEN00141 2019 11 22...

Page 19: ...9 MAINTENANCE Before use inspect all parts for damage Repair and replace as required Clean wash unit with a low pressure hose or damp cloth Keep unit free of snow and ice Metal hoods are recommended t...

Page 20: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 20 Publication AMEN00141 2019 11 22 PARTS Exploded View 620G Eclipse Manual 620G Exploded Diagram_191004 pdf...

Page 21: ...Rite Hite Installation Service Owner s Manual Eclipse Dock Shelter 620G 620NH Publication AMEN00141 2019 11 22 21 PARTS Exploded View 620G Continued...

Page 22: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 22 Publication AMEN00141 2019 11 22 PARTS Exploded View 620NH Eclipse Manual 620NH Exploded Diagram_191004 pdf...

Page 23: ...Rite Hite Installation Service Owner s Manual Eclipse Dock Shelter 620G 620NH Publication AMEN00141 2019 11 22 23 PARTS Exploded View 620NH Continued...

Page 24: ...ner s premises for the purpose of repairing or replacing the Product or y return of the Product to the Rite Hite F O B Rite Hite s factory NOT WARRANTED Rite Hite does not warrant against and is not r...

Reviews:

Related manuals for Eclipse 620G