
6 |
P a g e
1.4
LIST OF MATERIALS THAT YOU WILL SUPPLY, OR ARE RECOMMENDED
This is the list of required materials which are not included in this kit. You will acquire these items locally for your project. Use
this table to help you calculate your total project budget.
Item Description
Item Qty
Item
Cost
($)
Total
Item
Cost
($)
Item Image
Post Lumber (You
determine length)
3
Header Lumber (You
determine length)
4
1/2” X 2-3/4” (1/2-13
threads) Vibration Resistant
Hammer-On Stud Anchor
for Concrete.
McMasterCarr.com SKU
92188A305
12
3/8” x 3” SS Lag Screws (for
deck mounting).
McMasterCarr.com SKU
92351A636
12
50-lb Sandbags
6
Tape, for marking drill bit
depth
2”
NA
Grand Total Cost ($)
NA