
34 |
P a g e
1.14
SECURING HEADERS TO THE POST-TOP HEX ELBOWS
6.
Locate the two 5/16” holes on the vertical faces of the U-channels holding the header. Drill 3/32” X 1-1/4” deep
pilot holes at the center of eight 5/16” Holes. Four holes inside the pergola and four holes outside. Locate pilot
holes at the center of each 5/16” hole.